My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1999-2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3250
>
2300 - Underground Storage Tank Program
>
PR0232224
>
COMPLIANCE INFO_1999-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2021 10:42:38 AM
Creation date
6/3/2020 9:56:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999-2010
RECORD_ID
PR0232224
PE
2361
FACILITY_ID
FA0001877
FACILITY_NAME
AM PM HAMMER/I5 FOOD #83113
STREET_NUMBER
3250
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
08240009
CURRENT_STATUS
01
SITE_LOCATION
3250 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232224_3250 W HAMMER_1999-2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 R ... <br /> SAN JOAQUIN COUNTY ENVIRONMENTAL HEALTH DEPARTMENT <br /> UNDERGROUND STORAGE TANK <br /> RESPONSE PLAN- PAGE I (One Form per facil,ty) <br /> uu <br /> TYPE.OF ACTION ❑ I NEW PLAN El 2 CHANGE OF INFORMATION <br /> I. FACILITY INFORMATION <br /> _�_'A(TI-IF—rFYID4 (Agen,:VUse Only) <br /> FACLLITY NAME <br /> 1 <br /> FACILITY SITE ADDRESS 1163 CITY ciz- <br /> Lj <br /> LVI <br /> 11. SPILL CONTROL AND CLEANUP METHODS JI <br /> I This plan addresses unauthorized releases from UST systerns and supplements the emergency response plans and procedures in the facility's Hazardous Materals <br /> Business Plan <br /> , If safe to do so,facility personnel will take immediate measures to control or stop any release(e.g.,activate pump shut-off.etc.)and,if*necessary,safely rem ive <br /> einaming hazardous material from the UST system. <br /> e An%L release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of'the secondary containment SVStelT to <br /> contain the hazardous material,but not greater than 30 calendar days,or sooner if required by the local agency. Recovered hazardous materials,unless still suitable <br /> for their intended use,will be managed as hazardous waste. <br /> Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material may be reused until it becomes too saturated <br /> to be effective It will then be managed properly. Used absorbent material,reusable or waste,will be stored in a properly labeled and sealed container <br /> Facilitv personnel will determine whether or not any Water removed from secondary containment systems,or from clean-up activity,has been in contact With Uri', <br /> hazardous material ff the water is contaminated, it will be managed as hazardous waste. If the water has a petroleum sheen (i.e', rainbow colors), i is <br /> ;ontalrrinated A thick floating petroleum layer may not necessarily display rainbow colors. Water(hazardous or non-hazardous)from sumps,spill containers,,te <br /> will not he disposed to storm water systems. <br /> We will review secondary,containment systems for possible deterioration if any of the following conditions occur: <br /> I Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment: <br /> 2 Secondary containment is prone to damage from any equipment used to remove or clean up hazardous material collected in secondary containment: <br /> 3 hazardous material,other than the product/waste stored in the primary containment system, is placed inside secondary containment to treat or neutralize <br /> released product/waste,and the added material or resulting material from such combination is not compatible with secondary containment <br /> 111. SPILL CONTROL AND CLEAN-UP EQUIPMENT <br /> _PFRIODIC MAINTENANCE: Spill control and clean-up equipment kept permanently on-site is listed in the facility's Hazardous Materials Business Plan I hjsl <br /> equipment is inspected at least monthly,and after each use,and supplies are replenished as needed. Defective equipment is repaired or replaced as necessary <br /> LQI.'IPMFNT NOT PERMANENTLY ON-SITE,BUT AVAILABLE FOR USE IF NEEDED: (Complete onlyifapphcable) <br /> EQUIPMENT LOCATION AVAILABILITY <br /> R20 <br /> C_> <br /> R11 R21 <br /> R12 <br /> R13 R23. <br /> R14 R24 134 <br /> R15 R25 i 1,3s 1 <br /> IV. RESPONSIBLE PERSONS <br /> FHr FOLLOWING PERSONS)ISARE RFS?ONSIBLE FOR AUTHORIZING ANA WORK NECESSARY UNDER THIS RESPONSE PLAN: <br /> NAMR40 E TITLE <br /> L <br /> N..%ME F, R41 TITLE <br /> r- <br /> i NAME R42 TITLE <br /> NSA6-IF R41 TITLE 15; <br /> V. INDIRECT HAZARD DETERMINATION <br /> Timis information is required only when the presence of the hazardous substance can not be determined directly by the monitoring method used(e.gliquid—I e rel <br /> ineasurements in a tan",annular space or secondary piping are used as the basis for leak determination) <br /> "FIE FOLLOWING STEPS WILL BE TAKEN TO DETERMINE THE PRESENCE OR ABSENCE OF HAZARDOUS SUBSTANCl'. IN THE SECONDARY <br /> CONTAINMENT IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE <br /> SJCE D--e(06103)-1/3 06/2543 <br />
The URL can be used to link to this page
Your browser does not support the video tag.