My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1999-2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3250
>
2300 - Underground Storage Tank Program
>
PR0232224
>
COMPLIANCE INFO_1999-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2021 10:42:38 AM
Creation date
6/3/2020 9:56:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999-2010
RECORD_ID
PR0232224
PE
2361
FACILITY_ID
FA0001877
FACILITY_NAME
AM PM HAMMER/I5 FOOD #83113
STREET_NUMBER
3250
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
08240009
CURRENT_STATUS
01
SITE_LOCATION
3250 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232224_3250 W HAMMER_1999-2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Aug 11 06 03:34p Mike Dotten -533-2650 p.2 <br /> r <br /> AlItech Petro <br /> ` 17759 Buttercup Circle, Sonora, CA 95370 <br /> Phone: 209-532-7320; Fax: 209-533-2650 <br /> California Contractor 623541 A-Haz <br /> Mike@AlltechPetro.com <br /> MOMTORING SYSTEM CERTMCATION <br /> A. Generallnformation <br /> Facility Name:Hammer 1-5 Arco Date of Testing/Servicing:August 9,2046 <br /> Facility Address:3250 Hammer Lane,Stockton CA 95209 <br /> Facility Contact Person:Wes Parkinson Contact Phone No.:474-9125 <br /> Regulatory agency:San Joaquin Health;Inspector:Willy Ng;Phone: 468-9847;Fax 468-3433 <br /> Make/Model of Monitoring System:Veeder-Root TLS-350 <br /> This test report is a:0 Final Report(Facility was observed to be in Compliance)or a❑Preliminary Report(Unresolved Issues Exist) <br /> B. Inventom of EguipMent Tested/Cerdfied: <br /> Task ID:Regular NLmdw Tank ID:Regular Skave <br /> ®In-Tank Gauging Probe. Model:Mag i In-Tank Gauging Probe. Model"Mag i <br /> ®Annular Space or Vault Sensor. Model:Wrap Around Annular Space or Vault Sensor. Model:Wrap Around <br /> ®Piping Sump Sensor(s). Model:Float Switch ®Piping Sump Sensor(s). Model:Float Switch <br /> ❑Fill Sump Sensor(* Model:NONE ❑Frill Sump Sensor(s). Model:NONE <br /> ®Mechanical Line Leak Detector. Model:Red Jacket ❑Mechanical Line Leak Detector. Model: <br /> ❑Electronic Line Leak Detector. Model:NONE ❑Electronic Line Leak Detector. Model:NONE <br /> ®Tank Overfill/High-Leve]Sensor. Model:Drop Tube ®Tank Overfill/High-Level Sensor. Model:Drop Tube <br /> ®Fill ill buckets tested ®Pass ®Fail ®Fill ill buckets tested ®Pass ®Fail <br /> Tank ID:Premium Tank ID: <br /> ®In Tank Gauging Probe. Model:Mag 1 ❑In-Tank Gauging Probe. Model: <br /> ®Annular Space or Vault Sensor. Model:Wrap Around ❑Annular Space or Vault Sensor. 1: <br /> ®Piping Sump Sensor(s). Model:Float Switch ❑Piping Sump Sensor(s). Model: <br /> ❑Fill Sump Sensor(s). Model:NONE ❑Fill Sump r(s). Model: <br /> ED Mechanical Line Leak Detector. Model:FE Petro ❑Mechanical Line Leak Detector. Model: <br /> ❑Electronic Line Leak Detector. Model:NONE ❑Electronic Line Leak Detector. Model: <br /> ®Tank Overfill/High-Level Sensor. Model:Drop Tube ❑Tank Overfill/High-Level Sensor. Model: <br /> ®Fillspill buckets tested ®Pass []Fail ❑Fillspill buckets tested []Pass,[]Fail <br /> Dispenser ID: 1&2®Sump:®Dry®Water®Product Dispenser M.3&4® Sump:ZDry[]Water®Product <br /> Q Dispenser Containment Sensor(s). Model:Bravo Box ❑Dispenser Containment Sensar(s� Model:Bravo Box <br /> ®Shear Valve(s) (Functional test) ®Shear Valve(s) (Functional test) <br /> ®D' cnser Containment Floats) and Chains . ® ser Containmentfioa s and Ch ' s . <br /> Dispenser ID:5806®Sump: ®Dry®Water®Product Denser ID:7&8®Sump:®Dry❑water[]Product <br /> ❑Dispenser Containment Sensor(s). Model:Bravo Box ❑Dispenscr Containment Sensor(s). Model:Bravo Box <br /> ®Shear Valvc(s) (Functional test) ®Shear Valve(s) (Functional test) <br /> ®Di enser Containment Floatfsj and Chains . ® . user Containment Floa s and Cham s . <br /> Dispenser ID: ❑Sump:[]Dry[]Water[,)Product Dispenser ID: ❑Sump:[]Dry❑Water[]Product <br /> ❑Dispenser Containment Sensor(s). Model: ❑Dispenser Containment Sensor(s). Model: <br /> Q Shear Valve(s) (Functional test) ❑Shear Valve(s) (Functional test) <br /> ❑Di ser Containment FloLitQsand Chains. ❑DiffContainment s and Chains. <br /> C. Ceramcation-I certify that the equipment identified in this document was inspected/serviced in accordance with the manufacturers' <br /> guidelines. Attached to this Certification is information (a.& manufacturers' checklists) necessary to verify that this information is <br /> correct and a Plot Plan showing the layout of monitoring equipment. For any equipment capable of generating such reports,I have also <br /> attached a copy of the report; (cheek aU that apply): ®System set-up ®Alarm history report <br /> Technician: :T&& Mille Dotten,California Contractor License.Na: 623541 <br /> Certification:Veeder-Root:341-32-6743,Level 4. ICC UST Technician#5259412-UT <br /> Page 1 o13 03101 <br />
The URL can be used to link to this page
Your browser does not support the video tag.