My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1999-2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3250
>
2300 - Underground Storage Tank Program
>
PR0232224
>
COMPLIANCE INFO_1999-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2021 10:42:38 AM
Creation date
6/3/2020 9:56:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999-2010
RECORD_ID
PR0232224
PE
2361
FACILITY_ID
FA0001877
FACILITY_NAME
AM PM HAMMER/I5 FOOD #83113
STREET_NUMBER
3250
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
08240009
CURRENT_STATUS
01
SITE_LOCATION
3250 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232224_3250 W HAMMER_1999-2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
May 25 06 03:15p Mike Dotten 209-533-2650 p.1 <br /> AlItecht <br /> 17759 Buttercup Circle, Sonora, CA 95370 <br /> Phone: 209-532-7320; Fax: 209-533-2650 <br /> California Contractor 623541 A-Haz <br /> Mike@AlltechPetro.com <br /> MONITORING SYSTEM CERTIFICATION 1j <br /> A. General Information <br /> Facility Name:Hammer I-5 Arco Date of Testing/Servicing:January 5,2006 <br /> Facility Address:3250 Hammer Lane,Stockton CA 95249 <br /> Facility Contact Penson:Wes Parkinson Contact Phone No.:474-9125 <br /> Regulatory agency:San Joaquin Health;Inspector:Michelle;Phone:468-9847;Fax 468-3433 <br /> MakeiModel of Monitoring System: Veeder-Root TLS-350 <br /> This test report is a: M Final Report(Facility was observed to be in Compliance)or a❑Preliminary Report(Unresolved Issues Exist) <br /> B. Invents of E ni ment Tested/Certified: <br /> Tank ID:Regular Master Tank ID:Regular Skave <br /> ®In-Tank Gauging Probe. Model:Mag 1 ®In-Tank Gauging Probe. Model:Mag 1 <br /> ®Annular Space or Vault Sensor. Model: Brine ®Annular Space or Vault Sensor. Model:Brine <br /> ®Piping Sump Sensor(s). Model:Float Switch ®Piping Sump Sensor(s). Model:Float Switch <br /> ❑Fill Sump Sensor(s). Model:NONE ❑Fill Sump Sensor(s). Model:NONE <br /> ®Mechanical Line Leak Detector. Model:Red Jacket I Mechanical Line Leak Detector. Model:Red Jacket <br /> ❑Electronic Line Leak Detector. Model:NONE ❑Electronic Line Leak Detector. Model:NONE <br /> ®Tank Overfill/High-Level Sensor. Model:Drop Tube CK Tank Overfill I High-Level Sensor. Model:Drop Tube <br /> ®Fills ill buckets tested ®Pass ❑Fail 0 Fills ill buckets tested ®Pass ❑Fail <br /> Tank ID:Premium Tank ID: <br /> ®In-Tank Gauging Probe. Model:Mag 1 ❑In-Tank Gauging Probe. Model: <br /> ®Annular Space or Vault Sensor. Model:Brine ❑Annular Space or Vault Sensor. Model: <br /> ®Piping Sump Sensor(s). Model:Float Switch ❑Piping Sump Sensor(s). Model: <br /> ❑Fill Sump Sensor(s). Model:NONE ❑Fill Sump Sensor(s). Model: <br /> ®Mechanical Line Leak Detector. Model:Red Jacket ❑Mechanical Line Leak Detector. Model: <br /> ❑Electronic Line Leak Detector. Model:NONE ❑Electronic Line Leak Detector. Model: <br /> ®Tank Overfill/High-Level Sensor. Model:Drop Tube ❑Tank Overfill/High-Level Sensor. Model: <br /> ®Fills ill buckets tested ®Pass ❑Fail ❑Fills ill buckets tested ❑Pass []Fail <br /> Dispenser ID:1&2®Sump:®Dry❑Water❑Product Dispenser ID:3&4®Sump:®Dry❑Water❑Product <br /> ❑Dispenser Containment Sensor(s). Model:Bravo Box ❑Dispenser Containment Sensor(s). Model:Bravo Box <br /> M Shear Valve(s) (Functional test) ®Shear Valve(s) (Functional test) <br /> ®Dispenser Containment Floats and Chain(s). M Dispenser Containment Float(9 and Chain s). <br /> Dispenser ID:5&6 M Sump:®Dry❑Water❑Product Dispenser ID: 7&8®Sump:®Dry❑Water❑Product <br /> ❑Dispenser Containment Sensor(s). Model:Bravo Box ❑Dispenser Containment Sensor(s). Madel:Bravo Box <br /> M Shear Valve(s) (Functional test) ®Shear Valve(s) (Functional test) <br /> M Dispenser Containment Floats and Chains . M Dis cnser Containment Float(s)and Chains. <br /> Dispenser ID: ❑Sump:❑Dry❑Water❑Product Dispenser ID: ❑Sump: [--]Dry❑Water❑Product <br /> ❑Dispenser Containment Sensor(s). Model: ❑Dispenser Containment Sensor(s). Model: <br /> ❑Shear Valve(s) (Functional test) ❑Shear Valve(s) (Functional test) <br /> ❑Dispenser Containment Float s)and Chains. ❑Dis eraser Containment Floats and Chain s). <br /> C. Certification-I certify that the equipment identified in this document was inspected/serviced in accordance with the manufacturers' <br /> guidelines. Attached to this Certification is information (e.g. manufacturers' checklists) necessary to verify that this information is <br /> correct and a Plot Plan showing the layout of monitoring equipment. For any equipment capable of generating such reports,I have also <br /> attached a copy of th report;(eheck all Chad apply): ®System set-up ®Alarm history report <br /> Technician: Mike Dotten,California Contractor License.No.: 623541 <br /> Certification: Veeder-Root:341-32-6743;Level 4. ICC UST Technician#5259412-UT <br /> Page 1 of 3 03/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.