Laserfiche WebLink
May 25 06 03:16p Mike Dotten 209-533-2650 p.2 <br /> 1 <br /> Facility: Hammer 1-5 Arco <br /> D. Results of Testing/Servicing <br /> Software Version Installed: <br /> Cam lets the following checklist: <br /> ®Yes ❑ No* Is the audible alarm o erational? ❑Outside Audible Alarm? <br /> ®Yes ❑ No* Is the visual alarmoperational? <br /> ®Yes ❑ No* is the Rrint function operational? ❑Not installed. <br /> ®Yes ❑ No* Were all sensors visually ins ected,functionally tested,and confirmed o rational? <br /> ®Yes ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper o erasion? <br /> ❑Yes ❑ No* If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br /> ® NIA operational? <br /> ®Yes ❑ No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br /> ❑ N/A monitoring system detects a leak,fails to operate,or is electrically disconnected? If yes: which sensors initiate <br /> positive shut-down? (Check all that apply) ❑ Sump Sensors; ❑Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? ❑Yes; ❑No. <br /> ❑Yes ❑No* For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no <br /> ®NIA mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br /> fillpoint(s)and operating ro eri ? If so,at what pment of tank ea aci does the alarm trigger? <br /> ❑Yes* ®No Was any monitoring equipment replaced? If yes,identify specific sensors,probes,or other equipment replaced i <br /> and list the manufacturer name and model for all replacement Earts in Section E,below. <br /> ❑Yes* ®No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> ❑Product; ❑Water. If yes,describe causes in Section E,below. <br /> ®Yes ❑No* Was monitorin system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> ®Yes ❑No* jjsA monitorina equipment o rational per manufacturer's specifications? <br /> *In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: No Deficiencies. <br /> Page 2 of 3 03/0l <br />