My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1999-2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3250
>
2300 - Underground Storage Tank Program
>
PR0232224
>
COMPLIANCE INFO_1999-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2021 10:42:38 AM
Creation date
6/3/2020 9:56:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999-2010
RECORD_ID
PR0232224
PE
2361
FACILITY_ID
FA0001877
FACILITY_NAME
AM PM HAMMER/I5 FOOD #83113
STREET_NUMBER
3250
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
08240009
CURRENT_STATUS
01
SITE_LOCATION
3250 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232224_3250 W HAMMER_1999-2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
swRCB, January MOZ <br />Page,: --3— of <br />Test MethodDeveloped.By: <br />XPiping Manufacturer XIndustry Standard Professional Engineer <br />Other (Specify) <br />Test Method Used-- <br />XPressure <br />Other (Specify) <br />Vacuum <br />Hydrostatic. <br />Test Equipment Used. Pressure Gauges <br />Piping Run # `��, <br />Piping Material: �=� <br />Piping. Run # Z a <br />/,�-,s <br />Equipment Resolution: <br />Piping Run # 3 <br />.wa <br />Piping. Run # g! <br />1-i /•w5 <br />Piping Manufacturer: <br />, p, iii' <br />,4.0 • S.�/ 7 <br />4, 0• Sm�`i-fit <br />l�. D• Sys <br />Piping Diameter. <br />�' <br />Length of Piping Run: <br />— <br />2 S ° <br />/0.0 <br />75 <br />Product Stored- <br />g �-qa,5 Gk o/ice <br />q I OeJ� G 6s 44-1,- <br />Z7 40444-5 i <br />S? I/XE <br />Method and location of <br />piping -run isolation: <br />o P/ i <br />P- 7aBiO1,014fto. j,-5VPA.05A-%OtSTP�I; <br />1 S <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test•. <br />' p 011 n./ <br />) 0 m o '�/ <br />10 sra i • I <br />/ 0 AV <ie/. <br />Test Start Time: <br />o <br />!&p A -Am <br />-7, Fo xi <br />Initial Reading (Rj): <br />5 PSX. <br />a P.S 1 <br />S 5 .T. <br />5 P 5 <br />Test End Time: <br />g : 3o 4-M <br />19; 30 I ft <br />d ; <br />) 0 161.007 <br />Final Reading (RF): <br />S <br />5 T. <br />S P 5 Z7 <br />5' P 5 Z <br />Test Duration: <br />[ ha -,,e <br />hw <br />Change in Reading (RF-&): <br />Pass/Fail Threshold or <br />Criteria: <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />io <br />
The URL can be used to link to this page
Your browser does not support the video tag.