Laserfiche WebLink
SWRCB, January 2002 <br />S. SECONDARY PIPE TESTING: <br />Page � of q <br />Test Method Developed By: <br />Y, Piping Manufacturer X Industry Standard. Professional Engineer <br />Other (Specify) <br />Test Method Used: <br />X Pressure Vacuum <br />Other (Specify) <br />Hydrostatic <br />Test Equipment Used: Pressure Gauges <br />ng Run # !J' y Piping Run # <br />Piping Material: Ft / 5 <br />Equipment Resolution: <br />Piping Run # Piping Run # <br />Piping Manufacturer: <br />&,6>, <br />Piping Diameter: <br />Length of Piping Run: <br />7S <br />Product Stored:It <br />oe*AgAe p <br />Method and location of <br />piping -run isolation: <br />� <br />r1' l s <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />Test Start Time: <br />Initial Reading (R,): <br />S . S - L <br />Test End Time: <br />g ; 30 4 -*1 <br />Final Reading (RF): <br />S P. 5 -F. <br />Test Duration: <br />he-la� <br />Change in Reading (RF -R,): <br />,6�- <br />Pass/Fail Threshold or <br />Criteriia::�, <br />„� <br />'PestResult <br />- Bag <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />