My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1999-2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3250
>
2300 - Underground Storage Tank Program
>
PR0232224
>
COMPLIANCE INFO_1999-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2021 10:42:38 AM
Creation date
6/3/2020 9:56:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999-2010
RECORD_ID
PR0232224
PE
2361
FACILITY_ID
FA0001877
FACILITY_NAME
AM PM HAMMER/I5 FOOD #83113
STREET_NUMBER
3250
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
08240009
CURRENT_STATUS
01
SITE_LOCATION
3250 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232224_3250 W HAMMER_1999-2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />S. SECONDARY PIPE TESTING: <br />Page � of q <br />Test Method Developed By: <br />Y, Piping Manufacturer X Industry Standard. Professional Engineer <br />Other (Specify) <br />Test Method Used: <br />X Pressure Vacuum <br />Other (Specify) <br />Hydrostatic <br />Test Equipment Used: Pressure Gauges <br />ng Run # !J' y Piping Run # <br />Piping Material: Ft / 5 <br />Equipment Resolution: <br />Piping Run # Piping Run # <br />Piping Manufacturer: <br />&,6>, <br />Piping Diameter: <br />Length of Piping Run: <br />7S <br />Product Stored:It <br />oe*AgAe p <br />Method and location of <br />piping -run isolation: <br />� <br />r1' l s <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />Test Start Time: <br />Initial Reading (R,): <br />S . S - L <br />Test End Time: <br />g ; 30 4 -*1 <br />Final Reading (RF): <br />S P. 5 -F. <br />Test Duration: <br />he-la� <br />Change in Reading (RF -R,): <br />,6�- <br />Pass/Fail Threshold or <br />Criteriia::�, <br />„� <br />'PestResult <br />- Bag <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.