Laserfiche WebLink
I JAN -06-2000 12:37 <br />P. 03 <br />SITE SAFETY AND HEALTH PLAN <br />This site Safety and Hean Plan addresses the mkiy and health procedures that will be followed <br />du* fidd operations for the and 219iW-99M "V7 at the &m located at 3210- W—, <br />11 ....... ....... <br />Specib the SSBP addresses activities pertaining to the rcmval <br />& mstallation only ad ifto re ion activities at this time. <br />Approxirnately.Z field workers, will be involved in the site work activities which are scheduled to <br />last approxkwely I weeks. <br />1. Key Personml <br />2. Hazard Ambrsis <br />3. Personal Protective Equqovm <br />I <br />1 S. Site Co=ol Measures <br />62mergency Ptocedures <br />7. Docummation <br />Each of tbew elermnts are dwussed in detail below. <br />-NEL <br />KEY PERSON <br />W. Kea Wendt is the Project Mamger (PM). Mr. Don Gilmer is the site health and Safety <br />:Y <br />=.r <br />The site safty officer has completed 40 hrs of comprebendve health and safety trair hich <br />mms the mquimmnts of fit)e 29 Code of Federal Regulations Part 1910.120. The project <br />maxiager and other site workers have met ' <br />9 <br />the requkements of this regulation under Part <br />EqutvWent Trakiing and will receive site specific trainhig before entry to site. <br />The FoUming Telephone Number will be used to call for crnergency assn e: <br />