My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1999-2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3250
>
2300 - Underground Storage Tank Program
>
PR0232224
>
COMPLIANCE INFO_1999-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2021 10:42:38 AM
Creation date
6/3/2020 9:56:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999-2010
RECORD_ID
PR0232224
PE
2361
FACILITY_ID
FA0001877
FACILITY_NAME
AM PM HAMMER/I5 FOOD #83113
STREET_NUMBER
3250
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
08240009
CURRENT_STATUS
01
SITE_LOCATION
3250 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232224_3250 W HAMMER_1999-2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f) All mobile equipment must be equipped with seat belts which must be worn by <br />the operator at all times. <br />g) All job site vehicles will be equipped with a service brake, parking brake and <br />emergency brake system. <br />B. In the event of open excavations, which is a hazard to on-site workers, <br />the following policy regarding excavations will be followed: <br />a) Entry into excavations greater than 4 feet deep is prohibited, unless the <br />requirements of T8 CCR 1541 are met. <br />b) Hazards associated with general construction may occur during the course of <br />construction. Personnel should be alert and prevent as well as avoid these <br />hazards. <br />c) When tank removal is part of scope of work, there is a significant potential for <br />hazards from falling loads when lifting and removing tanks. Workers must be <br />especially alert to this hazard. <br />C. During general construction activities, there is also a potential for general <br />(construction type) safety hazards. This plan does not address general safety in <br />detail, If personnel are frequently reminded and will cooperate in being <br />courteous, careful, alert, and thoughtful of outlines safety procedures, and if <br />they use common sense in actions and in considering probable consequences, <br />much will already have been accomplished to insure a safe working environment. <br />El <br />
The URL can be used to link to this page
Your browser does not support the video tag.