Laserfiche WebLink
06/05/15 03:15PH HP LASERJET FAX <br />Yearly Employee Training <br />(Underground Storage Tank Facility) <br />:t, emergency shut off switch <br />This switch is use in case of emergencies, you should know where this switch is at all times. <br />2. Notification <br />In the event of a hazardous material release immediately, notify the appropriate authority. <br />Depending on the amount and location of the release, the following authority should be <br />contacted: <br />911 / Fire Department <br />Local Environmental Health Department <br />Underground Storage Tank Contractor <br />office of Emergency Services <br />S. Large Spills (25 gallons or more) <br />In the event of a large spill, the following action should be taken; <br />Fmergency shut off switch <br />Call 911 <br />Contain the spill to a limited area using absorbent material (do not rinse gasoline spills <br />with water) <br />Contact the local environmental health department <br />4, Small Spill (under 25 gallons) <br />in the event Of a small spill, the following action should be taken., <br />Contain the spill and secure area using absorbent material <br />Secure area with safety cones or caution tape <br />Dispose contaminated absorbent material in an appropriate label container <br />Small spill immediate reporting is not required if spilled is contained <br />S. Monitoring <br />Know where your underground storage tank alarm -monitoring console is located. <br />Log all alarms as they occur into your daily alarm log. <br />6, Maintenance <br />Make sure spill buckets, dispenser pans, turban sumps, and spill sumps are clean of any <br />liquid and or debris. <br />Check all hose and nozzle base filled for any cracks or tears, replace any cracks or torn <br />hose and nozzles face sea is. <br />7. Documentation <br />Keep all monthly designating inspection reports for a minimum of 3 years <br />Document all monitor alarms in the daily alarm log <br />Record all repairs and services in your daily repair log <br />Perform daily checklist <br />All documentations should be kept orderly and readily available upon request. <br />Zk, <br />. .of Hammerl-5 have received employee training by lames <br />Flowers (ern khly designated operator -Franzen -Hill Corporation) on 11-18-14 and have read and <br />understand the above training guide. <br />Signature., <br />