Laserfiche WebLink
Wo <br />06/05/15 03:15PM <br />HP LASERJET FAX 2099551865 <br />Yearly Employee Training <br />(Underground Storage Tank Facility) <br />p.07 <br />ENVIRONMENTAL, <br />1. Emergency shut off switch !�7- A'—RJ "C010-riAr-10-T' <br />This switch is use in case of emergencies, you should know where this switch is at all times. <br />2. Notification <br />In the event of a hazardous material release immediately, notify the appropriate authority. <br />Depending on the amount and location of the release, the following authority should be <br />contacted. <br />911 / Fire Department <br />Local Environmental Health Department <br />Underground Storage Tank Contractor <br />Office of Emergency Services <br />3. Large Spills (25 gallons or more) <br />In the event of a large spill, the following action should be taken: <br />Emergency shut off switch <br />Call 911 <br />Contain the spill to a limited area using absorbent material (do not rinse gasoline Spills <br />with water) <br />Contact the local environmental health department <br />4. Small Spill (under 2S gallons) <br />In the event of a small spill, the following action should be taken, <br />Contain the spill and secure area using absorbent material <br />Secure area with safety cones or caution tape <br />Dispose contaminated absorbent material in an appropriate label container <br />Small spill immediate reporting is not required if spilled is contained <br />11 .a <br />Know where your underground storage tank alarm -monitoring console is located, <br />Log all alarms as they occur into your daily alarm log. <br />6. Maintenance <br />Make sure spill buckets, dispenser pans, turban sumps, and spill sumps are clean of any <br />liquid and or debris. <br />Check all hose and nozzle base filled for any cracks or tears, replace any cracks or torn <br />hose and nozzles face seals, <br />7. Documentation <br />Keep all monthly designating inspection reports for a minimum of 3 years <br />Document all monitor alarms in the daily alarm log <br />Record all repairs and services in your daily repair log <br />Perform daily checklist <br />All documentations should be kept orderly and readily available upon request. <br />I, _Uozx,& LI—) i) a of Hammer 1-5 have received employee training by James <br />flowers (monthly designated operator -Franzen -Hill Corporation) on 9-23-14 and have read and <br />understand the above training guide. <br />Signature: <br />