My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3250
>
2300 - Underground Storage Tank Program
>
PR0232224
>
COMPLIANCE INFO_2011-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2021 10:16:11 AM
Creation date
6/3/2020 9:56:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2018
RECORD_ID
PR0232224
PE
2361
FACILITY_ID
FA0001877
FACILITY_NAME
AM PM HAMMER/I5 FOOD #83113
STREET_NUMBER
3250
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
08240009
CURRENT_STATUS
01
SITE_LOCATION
3250 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232224_3250 W HAMMER_2011-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
452
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Comments — (include information on repairs made prior to testing, and recommended follow-up for failed <br />tests) <br />RECEIVE) - <br />MAY 2 8 2015 <br />PIPING SUMP TESTING [E <br />Test Method Developed By: ❑ Piping Manufacturer ❑ Industry Standard ❑ Profes'ionalEn meer <br />® Other (Specify) Caldwell Sump Tester <br />Test Method Used: ❑ Pressure ❑ Vacuum ® Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: Caldwell Sump Tester Equipment Resolution: 0.005 inches in <br />JjjjjSump <br />MM <br /># 87 <br />Master <br />Sump # 87 <br />Sump # 91 <br />Sump # <br />Piping <br />Sump # Vapor <br />Turbine <br />Syphon Piping <br />Turbine <br />Transition <br />Pot <br />Sump Diameter: <br />48 inches <br />48 inches <br />48 inches <br />36 inches <br />36 inches <br />Sump Depth: <br />44 inches <br />44 inches <br />44 inches <br />58 inches <br />58 inches <br />Sump Material: <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Height from Tank Top to Top <br />27 inches <br />29 inches <br />26 inches <br />18 inches <br />36 inches <br />of Highest Piping Penetration: <br />Height from Tank Top to <br />17 inches <br />9 inches <br />10 inches <br />33 inches <br />33 inches <br />Lowest Electrical Penetration: <br />Condition of sump prior to <br />Dry/Clean <br />Dry/Clean <br />Dry/Clean <br />Dry/Clean <br />Dry/Clean <br />testing: <br />Portion of Sump Tested <br />33 inches <br />35 inches <br />32 inches <br />39 inches <br />37 inches <br />Does turbine shut down when <br />❑ Yes ❑ No <br />Oyes ❑No <br />Yes ❑No <br />❑Yes ❑No❑ <br />❑Yes ❑No❑ <br />sump sensor detects liquid <br />® NA <br />® NA <br />® NA <br />®NA <br />®NA <br />Turbine shutdown response <br />3 sec <br />3 sec <br />3 sec <br />3 sec <br />3 sec <br />time <br />Is system programmed for fail- <br />Yes No <br />Yes ❑No <br />Yes No <br />❑Yes _]No[] <br />❑Yes []No <br />safe shutdown <br />® NA <br />® NA <br />® NA <br />®NA <br />®NA <br />Was fail-safe verified to beYes <br />No <br />Yes No <br />Yes No <br />❑Yes ❑No❑ <br />❑Yes ❑No❑ <br />operational <br />® NA <br />® NA <br />® NA <br />®NA <br />®NA <br />Wait time between applying <br />pressure/vacuum/water and <br />5 minutes <br />5 minutes; <br />5 minutes <br />5 minutes <br />5 minutes <br />starting test: <br />Test Start Time: <br />8:00 am <br />9:00 am <br />;9:30 am <br />10:00 am <br />10:30 am <br />Initial Reading (R): <br />2"d Ring <br />2"d Ring <br />2nd Ring <br />2nd ring <br />2nd ring <br />Test End Time: <br />8:30 am <br />9:30 am <br />10:00 am <br />10:30 am <br />11:00 am <br />Final Reading (RF): <br />2"d Ring <br />2nd Ring <br />2"d Ring <br />2"d ring <br />god ring <br />Test Duration: <br />30 minutes <br />30 minutes <br />30 minutes <br />30 minutes <br />30 minutes <br />Change in Reading (R, -R,): <br />0 change <br />0 change <br />0 change <br />0 change <br />D change <br />0.005 inches <br />0.005 inches <br />0.005 inches <br />0.005 inches in <br />0.005 inches in <br />Pass/Fail Threshold or Criteria: <br />in 1/2 hour <br />in 1/2 hour <br />in 1/2 hour <br />1/2 hour <br />1/2 hour <br />Test Result: <br />E Pass <br />® Pass <br />®Pass <br />0 Pass <br />® Pass <br />Fail <br />❑ Fail <br />❑ Fail <br />[I Fail <br />❑ Fail <br />Was sensor removed for <br />❑Yes []No <br />❑Yes [:]No <br />❑Yes ❑No <br />❑Yes ❑No <br />❑Yes ❑No <br />testing? <br />I ®N/A <br />®N/A <br />® N/A <br />®`N/A <br />®N/A <br />Was sensor properly replaced <br />❑Yes ❑No <br />❑Yes ❑No <br />❑ Yes ❑No <br />❑Yes ❑No <br />❑Yes ❑No <br />and verified functional after <br />®N/A <br />®N/A <br />®N/A <br />Z N/A <br />®N/A <br />testing? <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed <br />tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.