My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3250
>
2300 - Underground Storage Tank Program
>
PR0232224
>
COMPLIANCE INFO_2011-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2021 10:16:11 AM
Creation date
6/3/2020 9:56:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2018
RECORD_ID
PR0232224
PE
2361
FACILITY_ID
FA0001877
FACILITY_NAME
AM PM HAMMER/I5 FOOD #83113
STREET_NUMBER
3250
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
08240009
CURRENT_STATUS
01
SITE_LOCATION
3250 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232224_3250 W HAMMER_2011-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
452
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
H i ECEIVEL) <br />Y 2 8 2015 <br />I' MIRONMENTAL <br />SECONDARY PIPE TESTING <br />Test Method Developed By: ❑ Piping Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: ® Pressure ❑ Vacuum ❑ Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: Pressure Guage <br />Equipment Resolution: 0 Change in <br />87 Master Product <br />91 Product <br />87 Syphon <br />Vapor Pot Evac <br />Chase <br />Piping Material: <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Piping Manufacturer: <br />Unknown <br />Unknown <br />Unknown <br />Unknown <br />Piping Diameter: <br />3 inches <br />3 inches <br />3 inches <br />3 inches <br />Length of Piping Run: <br />50 Feet <br />50 Feet <br />8 Feet <br />12 Feet <br />Product Stored: <br />87 octane <br />91 octane <br />87 octane <br />87/91 <br />Reducer Boot with <br />Sealed off Reducer <br />Reducer Boot with <br />Reducer Boot with <br />Method and location of <br />Schrader Valve in <br />Boot after pipe <br />Schrader Valve in <br />Schrader Valve in <br />piping -run isolation: <br />transition Sump <br />daylights <br />transition Sump <br />transition Sump <br />Wait time between <br />10 minutes <br />10 minutes <br />10 minutes <br />10 minutes <br />applying <br />pressure/vacuum/water <br />and starting test: <br />Test Start Time: <br />9:00 am <br />9:00 am <br />9:00 am <br />10:00 am <br />Initial Reading (R,): <br />5.0 psi <br />5.0 psi <br />5.0 psi <br />5.0 psi <br />Test End Time: <br />9:30 am <br />9:30 am <br />9:30 am <br />10:30 am <br />Final Reading (RF): <br />5.0 psi <br />5.0 psi <br />5.0 psi <br />5.0 psi <br />Test Duration: <br />1 hour <br />1 hour <br />1 hour <br />1 hour <br />Change in Reading (R, -R,): <br />0 psi <br />0 psi <br />0 psi <br />0 psi <br />Pass/Fail Threshold or <br />0 psi change <br />0 psi change <br />0 psi change <br />0.005 inches in 1/2 <br />Criteria: <br />hour <br />Test Result: <br />Pass ❑ Fail <br />Pass Fail <br />Pass Fail <br />Pass Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed <br />tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.