Laserfiche WebLink
H i ECEIVEL) <br />Y 2 8 2015 <br />I' MIRONMENTAL <br />SECONDARY PIPE TESTING <br />Test Method Developed By: ❑ Piping Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: ® Pressure ❑ Vacuum ❑ Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: Pressure Guage <br />Equipment Resolution: 0 Change in <br />87 Master Product <br />91 Product <br />87 Syphon <br />Vapor Pot Evac <br />Chase <br />Piping Material: <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Piping Manufacturer: <br />Unknown <br />Unknown <br />Unknown <br />Unknown <br />Piping Diameter: <br />3 inches <br />3 inches <br />3 inches <br />3 inches <br />Length of Piping Run: <br />50 Feet <br />50 Feet <br />8 Feet <br />12 Feet <br />Product Stored: <br />87 octane <br />91 octane <br />87 octane <br />87/91 <br />Reducer Boot with <br />Sealed off Reducer <br />Reducer Boot with <br />Reducer Boot with <br />Method and location of <br />Schrader Valve in <br />Boot after pipe <br />Schrader Valve in <br />Schrader Valve in <br />piping -run isolation: <br />transition Sump <br />daylights <br />transition Sump <br />transition Sump <br />Wait time between <br />10 minutes <br />10 minutes <br />10 minutes <br />10 minutes <br />applying <br />pressure/vacuum/water <br />and starting test: <br />Test Start Time: <br />9:00 am <br />9:00 am <br />9:00 am <br />10:00 am <br />Initial Reading (R,): <br />5.0 psi <br />5.0 psi <br />5.0 psi <br />5.0 psi <br />Test End Time: <br />9:30 am <br />9:30 am <br />9:30 am <br />10:30 am <br />Final Reading (RF): <br />5.0 psi <br />5.0 psi <br />5.0 psi <br />5.0 psi <br />Test Duration: <br />1 hour <br />1 hour <br />1 hour <br />1 hour <br />Change in Reading (R, -R,): <br />0 psi <br />0 psi <br />0 psi <br />0 psi <br />Pass/Fail Threshold or <br />0 psi change <br />0 psi change <br />0 psi change <br />0.005 inches in 1/2 <br />Criteria: <br />hour <br />Test Result: <br />Pass ❑ Fail <br />Pass Fail <br />Pass Fail <br />Pass Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed <br />tests) <br />