Laserfiche WebLink
' 1 <br /> San Joaquin County <br /> " Environmental Health Department DIRECTOR <br /> O Donna Heran, REHS <br /> 600 East Main Street <br /> r.x ? PROGRAM COORDINATORS <br /> s Stockton, California 95202-3029 Robert McClellon,REHS <br /> Jeff Carruesco, REHS,RDI <br /> Website: www.sjgov.org/ehd Kasey Foley, REHS <br /> 9 L/FOR <br /> Phone: (209)468-3420 Linda Turkatte,REHS <br /> June 22, 2010 Fax: (209)464-0138 <br /> John Sutfin <br /> Superior Underground Tank Services—SUTS <br /> Pb, ox 1487 <br /> San mon, CA 94583 <br /> Re: Kaiser undation - Manteca SR0061051 <br /> 1777 Wes osemite Ave, Manteca, 95337 <br /> The San Joaquin County En 'ronmental Health Department(EHD) has completed the review of <br /> the permit application to perfo closure in place for the following underground storage tank <br /> (UST)system along with the clos\Manteca <br /> ace for associated piping and appurtenances at the <br /> above noted address: <br /> 8,000 gallon UST(ID#39-0002329701) red dyed diesel. <br /> The permit has been approved wlio . g conditions: <br /> 1. Provide proof that the USinterstiti space has been certified clean. Submit a <br /> Hazardous Waste Tank Certification TSC Form 1249). <br /> 2. Contact the San Joaquin r Pollution Contr District and Building Department for <br /> any applicable permits anments. <br /> 3. Have a representative froty of Manteca Fire Depa went onsite during the <br /> drilling through the I IST and filling with slurry. <br /> 4. Any changes in information and scope of work must be submitted`tp EHD for approval <br /> prior to commencing work. All new addenda supersede the previousnes. <br /> 5. Contact Thuy Tran at(209) 468-8257 to arrange the following inspection appointments <br /> (a 48-hour notice is required for inspection appointments). <br /> a. Witness decontamination of the diesel underground tank, piping and intersKki l space <br /> b. Witness drilling and overseeing the four soil and water samples <br /> c. Witness sealing of borings starting from the bottom of the casing to the top <br /> d. Witness filling of UST starting from the bottom of the tank with Controlled Density <br /> (2 sack slurry mix)to the top of the UST <br /> e. Witness grouting of UST, pipe and all appurtenances 0 <br /> �1 <br /> W <br />