Laserfiche WebLink
t <br />SWRCB, January 2002 <br />Page I of 1 <br />5. SECONDARY PIPE TESTING <br />Test Method Developed By: <br />W Piping Manufacturer <br />r Industry Standard <br />r—' Professional Engineer <br />Other (Specify) <br />Test Method Used By: <br />W Pressure <br />r vacuum <br />F Hydrostatic <br />Other (Specify) <br />Test Equipment Used: gauge <br />Equipment Resolution: <br />0 loss <br />Oink <br />(—Tih 2C 1 M dress]) <br />F <br />STP Oanxmnient 1 to ust <br />STI' Oogtainment 1 to ust <br />Piping Material: <br />dw frp <br />dw frp <br />Piping Manufacturer: <br />ameron <br />ameron <br />Piping Diameter: <br />3 in. <br />3 in. <br />in. <br />in. <br />Length of Piping Run: <br />100 ft. <br />100 ft. <br />Product Stored: <br />Diesel <br />Diesel <br />Method and location of <br />-piping-run isolation: <br />sump <br />sump <br />Wait time between applying <br />pressure/vacuum/water and <br />5 min <br />5 min <br />min <br />min <br />starting test: <br />Test Start Time: <br />11:12:00 <br />11:12:00 <br />Initial Reading (RI): <br />3.00000 PSI <br />3.00000 PSI <br />Test End Time: <br />12:12:00 <br />12:12:00 <br />Final Reading (RF): <br />3.00000 PSI <br />3.00000 PSI <br />Test Duration: <br />1 hr <br />1 hr <br />Change in Reading (RF -RI): <br />0.00000 PSI <br />0.00000 PSI <br />Pass/Fail Threshold or <br />+/-0.00000 <br />+/-0.00000 <br />+/_ <br />+/- <br />Criteria: <br />TelRes It: <br />Pass,"" <br />Comments- (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />