Laserfiche WebLink
e <br />SWRCB, January 2002 <br />Page 1 of 1 <br />6. PIPING SUMP TESTING <br />Test Method Developed By: r Tank Manufacturer W Industry Standard r Professional Engineer <br />Other (Specify) <br />Test Method Used By: r Pressure r Vacuum W Hydrostatic <br />Other (Specify) <br />Test Equipment Used: VPLT Equipment Resolution: 0.00001 in. <br />Was sensor removed for testing? r Yes r No n NA cr," Yes r' No r NA r Yes r No r NA r Yes f" No r NA <br />Was sensor properly replaced and C+ Yes r Nor NA r Yes r Nor NA r Yes r Nor NA r Yes r No NA <br />verified functional after testing? <br />Comments ? (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />t If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an asterisk (*) is "NO" or "NA", the entire sump <br />must be tested. <br />STP Containment for <br />Tank 1 diesel - 1 <br />Sump Diameter: <br />48.00 in. <br />in. <br />in. <br />in. <br />Sump Depth: <br />48.00 in. <br />in. <br />in. <br />in. <br />Sump Material: <br />Fiberglass <br />Height from Tank Top to Top of <br />Highest Piping Penetration: <br />19.00 <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />10.00 <br />Condition of sump prior to testing: <br />good <br />Portion of Sump Tested' <br />21 <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />product and water)?* <br />r Yes C" No NA <br />C Yes r Nor NA <br />r Yes r No C NA <br />C Yes C No r NA <br />Turbine shutdown response time <br />00:00:00 sec <br />sec <br />sec <br />sec <br />Is system programmed for fail-safe <br />shutdown?* <br />r Yes C` No {*. NA <br />t"` Yes r Nor NA <br />C" Yes i'' No ry NA <br />r Yes r Nor NA <br />Was fail-safe verified to be <br />P Yes r No 4* NA <br />r Yes (7 Nor NA <br />0 Yes r Nor NA <br />s; <br />r Yes Nor NA <br />—operational?* <br />Wait time between applying <br />pressure/vacuum/water and starting <br />test <br />5 min <br />min <br />min <br />min <br />Test Start Time: <br />11:42:00 <br />Initial Reading (RI): <br />0.00000 in. <br />Test End Time: <br />12:42:00 <br />Final Reading (RF): <br />-0.00180 in. <br />Test Duration: <br />30 min <br />Change in Reading (RF -RD: <br />-0.00180 in. <br />Pass/Fail Threshold or Criteria: <br />+/-0.00200 <br />Was sensor removed for testing? r Yes r No n NA cr," Yes r' No r NA r Yes r No r NA r Yes f" No r NA <br />Was sensor properly replaced and C+ Yes r Nor NA r Yes r Nor NA r Yes r Nor NA r Yes r No NA <br />verified functional after testing? <br />Comments ? (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />t If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an asterisk (*) is "NO" or "NA", the entire sump <br />must be tested. <br />