Laserfiche WebLink
40 0 <br />Muniappa Naidu [EH] Page 1 of 1 <br />From: Sam.Corbin@kp.org <br />Sent: Friday, August 10, 2012 3:04 PM <br />To: Muniappa Naidu [EH] <br />Cc: darryl.b.curry@kp.org; dana.feiock@kp.org; Jeffrey. Deane@nsmtp.kp.org; Fred Just; bmccuaig@petro-analtyical.com; <br />Jay.D.Betz@nsmtp.kp.org <br />Good Afternoon Muni <br />Annual UST certification, spill bucket testing, precision line and SB989 is scheduled for 8.16.12 at approximately 09:00 hours.. <br />Unanticipated issues arose with generator repairs causing an approximate 10 day delay of installation. Testing will proceed on 8 <br />16 to meet the intent of the testing requirement. <br />Per your discussion with Jay Betz, additional tests required will be performed after generator is installed. Generator should be <br />completed and installed by 8 26 2012. 1 will notify you once I get the confirmation of delivery so we can schedule the remaining <br />tests.. <br />Please do not hesitate to contact me with any questions, comments or concerns. <br />A fax has been sent to your attention @ 209 468 3420 <br />Respectfully, <br />11W..1 <br />Sam Corbin <br />Chief Engineer <br />Facilities Engineering <br />Kaiser Manteca / Tracy Medical Center <br />Phone 1 209 825 3781 Tie Line ( 8 - 458 ) <br />Cell 1 209 629 9919 <br />Fax 1 209 825 3893 <br />Pager 1 209 833 2666 <br />NOTICE TO RECIPIENT: If you are not the intended recipient of this e-mail, you are prohibited from sharing, copying, or otherwise using or disclosing its contents. If you <br />have received this e-mail in error, please notify the sender immediately by reply e-mail and permanently delete this e-mail and any attachments without reading, forwarding <br />or saving them. Thank you. <br />8/13/2012 <br />