Laserfiche WebLink
r <br />SWRCB, January 2002 <br />Test Method Developed By: <br />Page 3 of i <br />5. SECONDARY PIPE TESTING <br />X Piping Manufacturer ❑ Industry Standard ❑ Professional Engineer <br />Cl Other (Specify) <br />Test Method Used: <br />X Pressure <br />❑ Other (Spec) <br />❑ Vacuum ❑ Hydrostatic <br />Test Equipment Used: Pressure Gauges in PSI/Nitrogen <br />.......... <br />Piping Run #1 <br />Piping Material: Fiberglass <br />Equipment Resolution: 1/10-15 PSI <br />Piping Run #2 Piping Run # Piping Run # <br />Fiberglass <br />Piping Manufacturer: <br />Ameron <br />Ameron <br />Piping Diameter: <br />3" <br />3" <br />Length of Piping Run: <br />Approx. 32' <br />Approx. 32' <br />Product Stored: <br />Fuel Oil Supply <br />Fuel Oil Return <br />Method and location of <br />i in -run isolation: <br />Clam Shell Test Port <br />At Building <br />Clam Shell Test Port <br />At Building <br />Wait time between applying <br />and starting test: <br />15 Minutes <br />15 Minutes <br />-pressure <br />Test Start Time: <br />8:45 <br />8:45 <br />Initial Reading (Rj): <br />5 PSI <br />5 PSI <br />Test End Time: <br />9:45 <br />9:45 <br />Final Reading (RF): <br />5 PSI <br />5 PSI <br />Test Duration: <br />i Hour <br />I Hour <br />Change in Reading (RF -R,): <br />0 PSI <br />0 PSI <br />Pass/Fail Threshold or <br />Criteria: <br />No Loss in PSI <br />No Loss in PSI <br />Test Result: X Pass ❑Fail X Pass ❑ Fail X Pass ❑ Fail Pass Fail <br />Comments— (include information on repairs made rior to testing, and recommended follow-up for failed tests) <br />