My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2013
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1777
>
2300 - Underground Storage Tank Program
>
PR0232397
>
COMPLIANCE INFO_2009-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2023 1:49:50 PM
Creation date
6/3/2020 9:56:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2013
RECORD_ID
PR0232397
PE
2361
FACILITY_ID
FA0003978
FACILITY_NAME
KAISER FOUNDATION - MANTECA
STREET_NUMBER
1777
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95337
APN
20018034
CURRENT_STATUS
01
SITE_LOCATION
1777 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\Y\YOSEMITE\1777\PR0232397\PERMANENT INJUNCTION 05-11-11.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
340
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />SWRCB, January 2002 <br />Test Method Developed By: <br />Page 3 of i <br />5. SECONDARY PIPE TESTING <br />X Piping Manufacturer ❑ Industry Standard ❑ Professional Engineer <br />Cl Other (Specify) <br />Test Method Used: <br />X Pressure <br />❑ Other (Spec) <br />❑ Vacuum ❑ Hydrostatic <br />Test Equipment Used: Pressure Gauges in PSI/Nitrogen <br />.......... <br />Piping Run #1 <br />Piping Material: Fiberglass <br />Equipment Resolution: 1/10-15 PSI <br />Piping Run #2 Piping Run # Piping Run # <br />Fiberglass <br />Piping Manufacturer: <br />Ameron <br />Ameron <br />Piping Diameter: <br />3" <br />3" <br />Length of Piping Run: <br />Approx. 32' <br />Approx. 32' <br />Product Stored: <br />Fuel Oil Supply <br />Fuel Oil Return <br />Method and location of <br />i in -run isolation: <br />Clam Shell Test Port <br />At Building <br />Clam Shell Test Port <br />At Building <br />Wait time between applying <br />and starting test: <br />15 Minutes <br />15 Minutes <br />-pressure <br />Test Start Time: <br />8:45 <br />8:45 <br />Initial Reading (Rj): <br />5 PSI <br />5 PSI <br />Test End Time: <br />9:45 <br />9:45 <br />Final Reading (RF): <br />5 PSI <br />5 PSI <br />Test Duration: <br />i Hour <br />I Hour <br />Change in Reading (RF -R,): <br />0 PSI <br />0 PSI <br />Pass/Fail Threshold or <br />Criteria: <br />No Loss in PSI <br />No Loss in PSI <br />Test Result: X Pass ❑Fail X Pass ❑ Fail X Pass ❑ Fail Pass Fail <br />Comments— (include information on repairs made rior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.