_ EMERGENCY -_-_ PETRO-ANALYTICAL INC.
<br /> PO. BOX 2301, ORINDA, CALIFORNIA 94563
<br /> I u T. (925) 253-0591 FAX (925) 927-823-2427
<br /> ALL DRAWINGS AND SPECIFICATIONS AND THE CONCEPTS
<br /> EMBOKAISEF� _ f ER MANTECA VITAL ' 777 W. YOSEMITE AVENUE , MANTECA , A 95333 THESE MATERIALS D WITHIN UTILIZED,GS ARE REFERENCES,HE ORIGINAL
<br /> UNPUBLISHED WORKS OF PETRO ANALYTICAL,INC. NO PART OF
<br /> '!HESE MATERIALS MAY BE UTILIZED, REFERENCES, DISCLOSED OR
<br /> REPRODUCED, IN ANY AND ALL MANNER OR BY ANY AND ALL
<br /> MEANS, FOR DESIGN, CONSTRUCTION OR RELATED PURPOSES,OR
<br /> ANY OTHER PURPOSES ON OTHER PROJECTS OR EXTENSION OF
<br /> THIS PROJECT.ANY USE OF THE PROJECT DOCUMENTS REQUIRES
<br /> BUILDING SITE PLAN: AREA OF WORK SEQUENCE OF WORK GENERAL NOTES PROJECT CODES SHEET INDEX WRITTEN CONSENT OF PETRO ANALYTICAL,INC..
<br /> NORTH • Verify that all permits have been procured. ALL CONSTRUCTION SHALL CONFORM TO
<br /> G"> 1. CONTRACTOR TO FURNISH ALL LABOR, MATERIALS, EQUIPMENT AND SERVICES NECESSARY THE FOLLOWING: FO-G1 COVER SHEET AND NOTES,
<br /> • Verify that the Fire Department, Building Department and.the Building Manager have been FOR THE SATISFACTORY COMPLETION OF ALL WORK CALLED FOR OR REQUIRED BY THE SIT'E/FACILITY PLAN AND MAP
<br /> SIERRA informed of the date work will start. Notification is to be provided 48 hours prior to start of DRAWINGS AND SPECIFICATIONS, GOVERNMENT CODE EDITION &AREA OF CONSTRUCTION
<br /> MOB work. 2. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH ALL CURRENT APPLICABLE CODES CBC 2010 FO-G2 P&ID
<br /> AREA OF CONSTUCTION MODIFICATION (SEE CODE REFERENCES ON G1)AND CAL-OSHA CONSTRUCTION SAFETY ORDERS AND ANY FO-M1 FUEL PIPING MODIFICATION
<br /> -SEE BUILDING REFERENCE PLAN BELOW • Lock-out and tag Out the power that supplies the two supply pumps located in the sump. OTHER APPLICABLE STATE, CITY,Oft COUNTY ORDINANCES. CFC 2010 DETAILS AND NOTES
<br /> OFFICE Remove the pumps from UST sump. 3. CONTRACTOR SHALL PROTECTALL EXISTING FACILITIES TO REMAIN UNLESS NOTED CEC 2010 FO-M2 MISCELLANEOUS DETAILS
<br /> BUILDING /� OTHERWISE.CONTRACTOR SHALL REPAIR OR REPLACE ANY EXISTING FACILITIES WHICH ARE CFC 2010
<br /> • Identify all pipes that enter the sump. (�I� DAMAGED BY THE CONTRACTOR'S OPERATIONS TO THE SATISFACTION OF THE OWNER. _.-
<br /> NFPA 30 2008
<br /> Yost MITE -LLLC�L'�C�I)•1-Il.l
<br /> * Saw cut the concr n ar the hole to expo a th 4. THE EXISTENCE OF UNDERGROUND UTILITIES IS UNKNOWN. IT SHALL BE THE CONTRACTORS NFPA 3T 2006 REV.NO DESCRIPTION DATE
<br /> * RESPONSIBILITY TO DETERMINE THE EXACT LOCATION(S)ANDIOR EXISIENCE OF ALL NFPA 110 2005 SITE DATA
<br /> Remov all of the underground Vent, F.O.S. & F.O.R. piping between UST and the UNDER-GROUND UTILITIES IN WORK AREA. PRIOR TO CONSTRUCTION,CONTRACTOR SHALL SUBMITTAL 4-9-13
<br /> building. CONTACT UNDERGROUND SERVICE ALERT FOR FIELD MARKING OF UTILITY LOCATIONS, A TITLE 10 CCR
<br /> OFFICE BLOCK/LOT: 2724/003
<br /> BUILDING LLLL 5. GENERAL CONTRACTOR SHALL NOTIFY THE ENGINEER PROMPTLY IF SITE CONDITIONS.OR JULY 1, 2012 AND AUGUST 1,2012 1Q COUNTY REVS. 10-10-13
<br /> DIMENSIONS DISAGREE WITH INFORMATION SHOWN ON THESE DRAWINGS. WORK IS NOT TO SUPPLEMENTS OF THE ABOVE LISTED OCC.CLASS: B
<br /> Remove (E) aboveground F.O.S. & F.O.R. piping in bailor room, generator room and at CONST.TYPE: U
<br /> ------ - MANTECA PROCEED UNTIL SUCH DIFFERENCES ARE RESOLVED. CALIFORNIA CODES ARE APPLICABLE TO
<br /> 1 MOB exterior as indicated on plan & details. STORIES: 1 2 BACKCHECK #1 10-15-13
<br /> f 1 6. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL SOILIGROUNDWATER SAMPLING AND THIS PROJECT
<br /> 1 • Remove E not-in-use F.O.R- piping which was art of the old generator da tank system. ANALYSIS. ENVIRONMENTAL CONSULTANT SHALL TRANSPORT AND DISPOSE OF TANK, PIPING Q3 OWNER REVISIONS 4-4-14
<br /> 1 ( > PP 9 P g Y y AND ANY CONTAMINATED SOIL AND GROUNDWATER. CONTRACTOR SHALL DISPOSE OF SCOPE OF WORK
<br /> 1 Where piping goes into the slab, remove flush to slab. The remaining portion within and CLEAN SOIL, CONCRETE DEBRIS AND MISCELLANEOUS EQUIPMENT.
<br /> ga HOSPITAL L6 under the slab (+/-4'), is to be triple rinsed and abandoned in pl;ca
<br /> oLULL I LIJ I I 1_ 1 0 -�-��� 1 3 7. ALL TEST RESULTS INCLUDING BUT NOT LIMITED TO 1. Remove the positive displacement pumps from the sump of the Underground
<br /> In
<br /> i9 • Repair the pipe and the secondary containment where the tee was removed. 8. STOCKPILE OF DIRT SHALL BE COVERED COMPLETELY WITH PLASTIC TARP. ANCHOR AND Storage Tank (UST). Revise the supply and overflow piping to the generator day tank
<br /> SECURE PLASTIC TARP FIRMLY TO PROTECT FROM THE ELEMENTS.
<br /> Tightness test the primary and secondary underground piping . so that it is supplied by the UST instead of:he AST.
<br /> 9. NO GALVANIZED PIPE OR FITTINGS FOR DIESEL SERVICE WILL BE ALLOWED. 2, Cap the piping from AST, that previously serviced the generator day tank, in such a
<br /> �_----- __-- -- _ Bed around the pipe with clean sand to a level 6" above the pipe. 0. ALL SHALL BE RIGID METAL PIPE THREADED CONNECTORS ABOVE OSHPD # S131392-39-00 Q2
<br /> Q2 way that it can be reused if needed.
<br /> Backfill the remainder of the excavation with CDF to the bottom of the surrounding GRADE, PVC BELOW GRADE. USE ONLY STEEL CONDUIT FITTINGS.
<br /> - concrete. 11. NEW TANKS AND PIPING TO BE TESTED IN ACCORDANCE WITH APPLICABLE REGULATIONS 3. Upgrade the leak monitoring system for the UST so that it meets the current leak OSHPD APPROVAL:
<br /> AND SPECIFICATIGNS. monit0 1 r Ir ts.
<br /> Concrete patch is to be doweled to the surrounding concrete. The repair concrete
<br /> etch shall match the color, thickness and finish of the existing concrete. See DtI. 2. ABOVE GROUND FUEL PIPING SHALL BE SECONDARILY CONTAINED AND MONITORED IF NOT 4. Remove all of the underground Vent, F.O.S. & F.O.R. piping between UST and the
<br /> WEST YOSEMITE AVE P g LOCATED INSIDE A ROOM WITH APPROVED SECONDARY CONTAINMENT.
<br /> 6/FO-M2 building . Also remove (E) aboveground F.O.S. & F.O.R. piping in boiler room,
<br /> 13. THE CONTRACTOR IS TO COMPLY WITH ALL DUST CONTROL REQUIREMENTS AS SET FORTH generator room and at exterior as indicated on plan & details. Remove (E) not-in-use
<br /> • Valve and plug AST pipe that previously supplied fuel to the generator. (Pipe will be BY THE FACILITY SUPERVISOR OR HIS DESIGNATED REPRESENTATIVE WHEN DRILLING, F.O.R. piping which Was a
<br /> CORING,OR OTHERWISE MAKING HOLES OR PENETRATIONS INSIDE THE FACILITY BUILDING, P P g part of the old generator day tank system. Where piping goes
<br /> left In place for future use If needed). INCLUDING SCREW HOLES FOR CONDUIT SUPPORTS, ETC.AS A MINIMUM EFFORT,THE into the slab, remove flush to slab. The remaining portion within and under the slab
<br /> CONTRACTOR WILL CONTAIN AND COLLECT ALL DUST BY MEANS OF PLASTIC SHEET
<br /> • A work plan shall be in piece to enable the transfer of fuel supply from the AST to the ISOLATION OF THE WORK AREAAND VACUUMING THE DUSTAS IT OCCURS. (+/- 4'), is to be triple rinsed and abandoned in pla 3
<br /> UST In less than 2 hours or less.. 14. NO WORK IS TO BE PERFORMED OVER THE SWITCH EQUIPMENT WITHOUT WORK PLAN AND
<br /> • Prime the pumOWNER'S APPROVAL. ROJECT DIRECTORYps and verify that the pump systems are operational.
<br /> • Upgrade the UST leak monitoring system. Install a new Veeder-Root TLM level sensor PROJECT ENGINEER: CONSULTANT:
<br /> pg g Y PROJECT LOCATION: MECHANICAL ENGINEER:
<br /> in the piping sump. Use one of the conduits that previously provided power to one of KAISER HOSPITAL AARON M. NEWMAN P.E.
<br /> 1777 W. YOSEMITE AVENUE 3095 SPILLMAN LANE
<br /> the pumps for the TLM conductors. Use the other conduit that previously provided SAN JOAQUIN COUNTY MANTECA, CA 95333 PETALUMA, CA 94952
<br /> power to the other pump for the new Veeder-Root leak sensor that replaced the ENVIRONMENTAL HEALTH DEPARTMENT T (707) 479-4594
<br /> 1868 E. HAZELTON AVE. ON-SITE REPRESENTATIVE: F (707) 763-1248 OFESSr
<br /> existing one in the sump. Install a new level sensor in the tank interstitial reservoir. STOCKTON,CA 95205 DANA FEIOCK ea °kc
<br /> T 209 735-5314 CONTACT: AARON NEWMAN Qyo oN M. ,vpss t�,
<br /> All sensor leads will be extended to the Veeder-Root panel. Replace existing overfill (209)468-3420 ( )
<br /> �APprafod ARCHITECT (FUEL SYSTEM): Z m
<br /> alarm panel with a new overfill alarm panel with test and silence switches. Upgrade A roved with changes,Sea Remarks Na.M02e114 m
<br /> pp 9 CULPEPPER + FORGENSI ARCH. n
<br /> ❑Disappruved See Re CONTRACTOR: Ero.06isa15
<br /> the Veeder-Root to include the TLS 350 Plus as required to make a complete system. 21 TAMAL VISTA BLVD., SUITE 241
<br /> Remarks r PETRO ANALYTICAL, INC, CORTE MADERA, CA 94925ZZ
<br /> Recertify the Veeder-Roo[ leak monitoring system. PO BOX 2301 sr y
<br /> ORIPNDA, CA 94563 T (415) 927-3360
<br /> T (925) 253-0591 F (415) 927-3728 (,
<br /> Data ey CONTACT: MICHAEL CULPEPPER
<br /> Approv 1 extends only to that Lich is shown and described F (925) 253-9576 APR 0 9 2014
<br /> hereon and does not authorize or approve any omission W
<br /> deviation from requirements of state laws or localordinanceS,
<br /> PROJECT TITLE:
<br /> ABBREVIATIONS MODIFICATION OF EMERGENCY
<br /> POWER FUEL SYSTEM
<br /> ABBREVIATIONS USED IN THE DRAWING PACKAGE KAISER [9CC�A/I A AIEA/TG
<br /> SEE AREA OF MODIFICATION- `/ s, yp /y ���ryryy I� swn v !T !'C/V Y�fyI�M !il ® G
<br /> PLANS AND NOTATIONS 1 EXISTING
<br /> ISTIN �, H SPIT L W F
<br /> 1 a.d !./ I 1 r ,::.10 (E) EXISTING GPM GALLONS PER MINUTE ■ ,� w , S 4i^.� 4. HOSPITAL
<br /> O A ^ITA L
<br /> (N) NEW GPH GALLONS PER HOUR MA I L H J/'/
<br /> (E)AST FO-M7 (typ) TYPICAL HP HORSE POWER
<br /> EQUIPMENT YARD - .,.. AS ABOVEGROUND HOA HAND-OFF-AUTO 777 W. YOSEMITE AVENUE
<br /> OPEN TO AIR (E) 8K UST r AFS AUTOMATIC FIRE SPRINKLER HT HEIGHT
<br /> i— - -------------� ������-------- AST ABOVEGROUND STORAGE TANK JB JUNCTION BOX MANTECA, CA 95333
<br /> I 1 ASV ANTISIPHON VALVE KW KILOWATT
<br /> B-FOR BOILER FUEL OIL RETURN LC LEVEL CONTROLLER
<br /> Z1 1 14. : ' : B-FOS
<br /> BOILER FUEL OIL SUPPLY LS LEAK SENSOR
<br /> 1 I ` ' BTN BETWEEN MAX MAXIMUM PROJECT NUMBER: 13003
<br /> 1 I T CAB CABINET MB MACHINE BOLT
<br /> C.L. CHAIN LINK DRAWN BY: JRS
<br /> ❑ MFR. MANUFACTURER
<br /> CLR CLEAR MIN. MINIMUM
<br /> EXISTING I- I� CMU CONCRETE FILLED MINT MOUNT
<br /> r EXISTING HOSPITAL "- ""° MASONRY BLOCK WALL MW MEGAWATT CHECKED BY: AMN
<br /> ® I
<br /> O HCONC CONCRETE N/A NOTAPPLICABLE
<br /> E HOSPITAL CONN. CONNECTION NC NORMALLY CLOSED
<br /> \- I
<br /> BUILDING Peel SCALE: AS SHOWN f o USE: HO
<br /> ❑ p OCCUPANCY: GROUP I,DIV, 1.1 ; G'. a CS CARBON STEEL NO NORMALLY OPEN
<br /> 1 u I TYPE CONST.: TYPE I, SPRINKLERED DBL DOUBLE OA OVERALL
<br /> 1 u o 1 AREA: FIRSTFLOOR: 56,167SF _ DIA DIAMETER
<br /> O.C. ON CENTER SHEET TITLE
<br /> 1 1 SECOND FLOOR:_,1222 SF a DT DAY TANK PDT D.T. FUEL RETURN PUMPS
<br /> A __ _.._—...._
<br /> 1 i TOTAL 88,6895E
<br /> 1 1 FA EACH PVC POLYVINYL CHLORIDE PIPE
<br /> 1 - r EMBED EMBEDMENT SCH SCHEDULE
<br /> 1
<br /> ' ELER ELECTRIC S.S. STAINLESS STEELEMECOVER SHEET SITE
<br /> F.G. EMERGENCY STI SQUARE
<br /> 1 L rte.
<br /> F.G. BTL STEEL �
<br /> > F.O.R. FUEL OIL RETURN REQ. REQUIRED
<br /> F.O.S. FUEL OIL SUPPLY TF TEST FITTING PLAN, NOTES & MAPS
<br /> F.V. FIELD VERIFY THK THICK
<br /> ; ,a a , TLM TANK LEVEL MONITORING
<br /> ------ - ------- -----•� NORTH sE, �,`: -iF• GA GAUGE
<br /> GENERATOR ROOM- BOILER/MECHANICALROOM-
<br /> NOSECONDSTORV NO SECOND STORY OVER '��,- i ) GAL GALLON TRANSDUCER
<br /> OVER ���� 5 " GEN GENERATOR U/G UNDERGROUND
<br /> SHEET NUMBER
<br /> � a �` UST UNDERGROUND STORAGE TANK
<br /> V-R VEEDER-ROOT
<br /> VS VACUUM SENSOR
<br /> 1 BUILDING REFERENCE PLAN - AREA OF MODIFICATION NO SCALE VICINITY MAP F0mG1
<br /> NORTH
<br />
|