Laserfiche WebLink
PETRO-ANALYTICAL, INC. <br /> PO. BOX 2301 , ORINDA, CALIFORNIA 94563 <br /> T. (925) 253-0591 FAX (925) 927-823-2427 <br /> ALL DRAWINGS AND SPECIFICATIONS AND THE CONCEPTS <br /> EMBODIED WITHIN THESE DRAWINGS ARE THE ORIGINAL <br /> UNPUBLISHED WORKS OF PETRO ANALYTICAL,INC. NO PART OF <br /> THESE MATERIALS MAY BE UTILIZED, REFERENCES, DISCLOSED OR <br /> REPRODUCED, IN ANY AND ALL MANNER OR BY ANY AND ALL <br /> MEANS, FOR DESIGN, CONSTRUCTION OR RELATED PURPOSES, OR <br /> ANY OTHER PURPOSES ON OTHER PROJECTS OR EXTENSION OF <br /> THIS PROJECT.ANY USE OF THE PROJECT DOCUMENTS REQUIRES <br /> — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — <br /> — — — — — WRITTEN CONSENT OF PETRO ANALYTICAL, INC.. <br /> — <br /> I (E) MONITORING <br /> SYSTEM F R TLS 350 <br /> — — — — — — — — — - - --] <br /> I I I I- - - - - - - - - - - - <br /> GENERAL <br /> - - - - - - - - - - <br /> GENERAL NOTES: <br /> LEAK MONITORING SYSTEM FOR UNDERGROUND STORAGE TANK WILL BE UPDATED AND INTEGRATED <br /> REV.NO DESCRIPTION DATE <br /> INTO THE VEEDER—ROOT TLS 350 SYS?EM <br /> SUBMITTAL 4-9-13 <br /> PRiMARY AND SECONDARY RPES THAT PREVIOUSLY SERVICED THE BOILERS FROM THE USE WILL BE EXTENDED <br /> I I I ABOVEGROUND AND CONNECTED TO THE PIPE PREVIOUSLY SUPPLYING THE GENERATOR DAY TANK FROM THE AST <br /> COUNTY REVS. 10-10-13 <br /> y INFORMATION SHOWN ON THIS DRAWING DEPSCFS CONTROL FUNCTIONS. <br /> PH , SICAL , IPE RO'�TS, VALVE LO <br /> -- -- -- — v PIPE CA IONS, FILL, AND OTHER INSTAi_LATION DATA ARE SHOWN ON <br /> I _ — LAYouT <br /> � AND DETAIL DRAWNGS. �2 BACKCHECK #1 10-15-13 <br /> I I I — �I- - � — � I <br /> OWNER REVISIONS 4-4-14 <br /> S II I <br /> DAY TANK <br /> (� coNTROL <br /> FOS <br /> I I I IH � liI -- -- <br /> I I Del ( � -SH- <br /> LS <br /> SH } OSHPD # S131392-39-00 �2 <br /> _. _ _.....�_ c. I �I�1__-- I <br /> FOR <br /> _ _.__..._____._..............._." .....____._._..._....__ __.._:....." J I LS ( fit LSHL . � -F � OSHPD APPROVAL: <br /> I <br /> 1013 CF TANK DRIP PAN I Ls- > <br /> CA- <br /> U� <br /> I I 0 z z <br /> O z O <br /> Iz <br /> RISER�O I REMAIN I I I (E) GENERATOR #1 <br /> OFA (N)I „ I I I Q — <br /> L` J I `. <br /> I I �m i <br /> I II I { I (E) GENERATOR #1 DAY TANK <br /> EXISTING <br /> I -WoMEGAFIEX <br /> I I 150 GALLONS <br /> TANK FILL WALL PIPE CONiiNUOUS <br /> 1" Fos FROM USE TO DAY TANK, LS oL PROJECT ENGINEER: CONSULTANT: <br /> (N) DUALOY BELOW AND ABOVE GROUND <br /> I LCX U.G. VENT ( 1 1 2 ' -FOR <br /> PAPE- f._ <br /> I Q I � EXISTING DAY TANK IN GENERATOR ROOM <br /> LS <br /> Luc <br /> �pFE S10H <br /> Ne2cc,`�2 <br /> h R4 m <br /> NO�M026214 � <br /> * {� <br /> D4 TGCKAB' F ILALL 41 VL E] LS LEAK SEvSOR 0 SH LL VL- IC l,GH HIGH HIGH 95% (RETURN PUMP ON) OF CA <br /> (E)UNDERGROUND FLEX CONNECTOR TF TUST �- ',NO O LSH SWITCH HIGH HIGH 92% (RETURN PUMP OFF APR 0 9 2014 <br /> ( LEVEL ) <br /> STORAGE TANK 4{- �0\ 4 PI PR-SSURF GAUGE <br /> S0 <br /> GALLONS000 <br /> 4 PVI �RESSv rI-vACU-V GAF ;T LSH LEVEL swITCH HIGH 90% (LEAD/LAG PUMP(s) OFF). PROJECT TITLE: <br /> Y S iiAl\'ER <br /> -D PIPE REDUCER O -SI /CL SWITCH LOW 70% (LEAD PUMP ON) <br /> MODIFICATION OF EMERGENCY <br /> - <br /> LSI- swnaI Low Low so% (LAc PUMP AND ALARM ON) POWER FUEL SYSTEM <br /> ....._ _._._.._._ ___ —.. __—_....._. ___.._... .......__ _. <br /> AN ! SIPHON VA I..V E- HAND PUMP <br /> _ _ OIL SUPP- KAISER PERMANENTS <br /> w FILTER FOR FUEL OII-- RLTURr.I <br /> MANTECA HOSPITAL <br /> e 4 1777 W. YOSEMITE AVENUE <br /> MANTECA, CA 95333 <br /> GENERAL NOTE: PROJECT NUMBER: 13003 <br /> INFORMATION SHOWN ON F A DRAWING DEPICTS CONTROL FUNCT ONS. <br /> PHYSICAL PIPE ROUTES, VALVE LOCATIONS, FILL, AND OTHER INSTALLATION DATA ARE SHOWN ON <br /> DRAWN BY: JRS <br /> LAYOUT AND DETAIL DRAWINGS. <br /> FUEL STORAGE VOLUME REQUIRED <br /> CHECKED BY: AMN <br /> FUEL CONSUMPTION OF GENERATOR 45 GPH <br /> 72 HOUR FUEL REQUIRED (72 HRS x 45 GALfHR ) = 3240GALLONS SCALE: AS SHOWN <br /> 133%* DESIRED TANK FUEL STORAGE (1.33 x 3240 GAL) = 4310 SHEET TITLE <br /> The existing underground tank is has an 8000 gallons capacity therefore it is more than <br /> adequate to meet the 133% requirement. <br /> A low fuel level alarm will be set in the Veeder-Root at the 72 hour fuel capacity plus 5% of <br /> the tank capacity, 3540 gallons (3240gallons + 400 gallons). MODIFIED PARTIAL <br /> *The 133% requirement is assumed to include the 5% of fuel unavailable below the suction P&I D <br /> A2 and the 10% tank not available because of the 90% maximum fill requirement. <br /> SHEET NUMBER <br />