Laserfiche WebLink
PETRO-ANALYTICAL, INC. <br /> • • • • • <br /> Lt <br /> z n (D F00 <br /> PO. BOX 2301 , ORI NDA, CALIFORNIA 94563 <br /> -0 Ln Lc' o ° c° T. (925) 253-0591 FAX (925) 927-823-2427 <br /> ° gym - Lf) m D , <br /> S M 1iLn <br /> i� U- Y � ALL DRAWINGSAND SPECIFICATIONS AND THECONCEPTS <br /> • �\ i , <br /> EMBODIED WITHIN THESE DRAWINGS ARE THE ORIGINAL <br /> / ❑ T -- UNPUBLISHED WORKS OF PETRO ANALYTICAL,INC. NO PART OF <br /> I THESE MATERIALS MAY BE UTILIZED, REFERENCES, DISCLOSED OR <br /> / • - '— REPRODUCED, IN ANY AND ALL MANNER OR BY ANY AND ALL <br /> (E)TRANSFER PUMP - - MEANS, FOR DESIGN, CONSTRUCTION OR RELATED PURPOSES, OR <br /> / Q ANY OTHER PURPOSES ON OTHER PROJECTS OR EXTENSION OF <br /> • (E) FO PIPING Of CO N 1 HOUR CORRIDOR THIS PROJECT.ANY USE OF THE PROJECT DOCUMENTS REQUIRES <br /> 00 WRITTEN CONSENT OF PETRO ANALYTICAL, INC.. <br /> SA x <br /> 1 i <br /> ELECT PANELS 2 — U n <br /> &BRACKETS p N D) <br /> � � z N � DO CL NO Ln <br /> Lf) <br /> / - L � �x � n WCD � � wr` � wm1 � o <br /> Y REV.NO DESCRIPTION DATE <br /> 1 HOUR CONSTRUCTION- <br /> ELECTRIC <br /> SUBMITTAL 4-9-13 <br /> � ELECTRIC <br /> EQUIP El = I <br /> 0 (E) i' V COUNTY REVS. 10-10-13 <br /> GENERATOR I I w N DO — 0 0 BACKCHECK #1 10-15-13 <br /> KEY NOTES I I - <br /> �D 3 OWNER REVISIONS 4-4-14 <br /> E` W d 0 <br /> 1Q (E) FIBERGLASS UST. FOR USE ONLY AS SUPPLY TO (E) ,I 8K LIST SEE MODIFIED <br /> GENERATOR I PIPING AT TANK O <br /> Q (E) VENT TO BE REMOVED A2 III SUMP, ivFO-M2 - <br /> O3 (E) RETURN PIPING TO BE REMOVED :.� yJ�(N .R.&F. -FLEX / <br /> III I �'� ,/� F.O.R.8 F.O.S.LIN - / <br /> I UNO[RGROUND _ <br /> (E) SUPPLY PIPING TO BE REMOVED III I -- <br /> I 4 OSHPD # S131392-39-00 02 <br /> OS (E) GENERATOR DAY TANK II. f L\ / �: IN)OMEGA_FLEX g <br /> �.'���*/// F.O.S. &F.O.R.LINES OSHPDAPPROVAL: <br /> © (E) DUPLEX SUPPLY PUMP WITH CONTROLS MOUNTED ON I ` �' BELOW ABOVE ABOVEGROUND, <br /> DAY TANK x (N)D'JALOY SEE OMEGA- GROUND GROUND SUPPORT ON(E) 5 6 Y B BOILER/MECHANICAL ROOM <br /> LCX U.G.VENT N:*� FLEX PIPING G WALL MOUNTED 1 HOUR RATED WALLS,20 CJ DO -' - <br /> DET. 1/PO-M2 BRACKETS, SEE MIN UTF_RATED DOORS 70 0 / <br /> 7 (E) SUPPLY PUMP CONTROL BOX MOUNTED ON DAY TANK I LINE— W O <br /> O DETAIL 1/FO-M2 CORRIDOR,SLAB FLOOR <br /> ® (E) OVERFLOW PUMP AND CONTROL MOUNTED ON DAY TANK III CHILLER \ \ -� — — AFS THROUGHOUT O X00 <br /> 2 <br /> I Ix <br /> OLLJ <br /> (E) VEEDER-ROOT TLS-350 I T❑ ❑ - -F' <br /> LINES) <br /> EREMOVED(NES <br /> 10 OVERFILL ALARM III (DASHED — - <br /> I I <br /> (E)VENT RISER TO <br /> REMAIN,SEE CONN. I - A <br /> DETAIL 21F0-M2 <br /> 2 <br /> NOTE. I (E)FO PIPING II <br /> ALL CONDITIONS SHOWN AND ITEMS I PROJECT ENGINEER: CONSULTANT: <br /> LISTED ARE EXISTING UNLESS <br /> OTHERWISE NOTED. O O O O i t <br /> o 0 <br /> OQROFESSION <br /> II CHILLER o�n+ roEWAgFyc <br /> y eQ 2 i <br /> No.NJ 26214 a <br /> Do.M3011) <br /> KPIX DIESEL yE' <br /> III FUEL TANK sg C <br /> I I <br /> NORTH <br /> III APR 0 9 2014 <br /> PROJECT TITLE: <br /> / MODIFICATION OF EMERGENCY <br /> POWER FUEL SYSTEM <br /> 1 ENLARGED FLOOR PLAN- AREA OF MODIFICATION KAISER PERMANENTE <br /> N.T.S. MANTECA HOSPITAL <br /> (E)F.O.R.NOT IN USE) <br /> T DISCONNECT <br /> TOBEREMOVED <br /> (E)F.O.S/F.O.R.RISERS TO BE II --- - - -(' AND CAP(E) 1777 W. YOSEMITE AVENUE <br /> REMOVED ...1. ---- , 9--tom , -rrr-LT -� F.O.S_ <br /> - s -- RACK UP�84_ MANTECA, CA 95333 <br /> FIELD VERIFY <br /> (E)F.O.S/F,O.R. RISERS TO PROJECT NUMBER: 13003 <br /> ( 1 GENERATOR TO BE REMOVED <br /> DRAWN BY: JRS <br /> PATCH, REPAIR PENETRATION @ (E)STUCCO <br /> 1 4 i HR.WALL OVER FRAMED RACK <br /> PIPE SUPPORT <br /> WALL—,,. <br /> ALL RACHECKED BY: AMN <br /> 1 I 1 ! JE)CONDUITS <br /> ? _ _ I <br /> (E)VENT TO ROOF I ( ( I (E)F.O.S./F.O.R.TO BE <br /> Q (E)GEN F - S-- REMOVED <br /> ✓) SCALE AS SHOWN <br /> -- -- -- F qct <br /> Q Uv v +- --- - )1 (E)PILASTER II SHEET TITLE <br /> -, - <br /> ❑ �_� jJ 'I ;I �(E)CONDUIT <br /> (E)PAINTED MODIFIED ABOVE <br /> lJ LI CONG (E) UST VENT <br /> CUT F.O.S. LINE FROM AST, - (E)SUPPORT RACK i '. RISER <br /> AN <br /> CAP AND SEAL _ <br /> mm mmm ym !Tm� (E)F.OR @TEE,CAP 8 <br /> SEAL <br /> iIl <br /> (E)RAISED SLAB <br /> GROUND FUELING <br /> O m r m NFILL, FINISH FLUSH,SEAL <br /> (E)SUPPORT RACK m 0 O O WALL PENETRATIONS,TVP. PIPING PLAN <br /> n p ~O m O 3 (E)WALL PENETRATION �- <br /> Oz K m m v lE) GD <br /> m m > m o m SHEET NUMBER <br /> n w > o ---- -- -- -- <br /> mD N A m <br /> F0=M1 <br /> 2 GENERATOR F.O.S./F. ,R. PIPE MODIFICATION @ BOILER ROOM 3 PARE 4 PARTIAL ELEVATION (EAST) 5 SPARE <br /> SCALE: 3l4" = 1'-0" SCALE: NONE (E) FUEL PIPE RISERS SCALE: 3/4" = 1'-0" SCALE: NONE <br />