My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2017-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1777
>
2300 - Underground Storage Tank Program
>
PR0232397
>
COMPLIANCE INFO_2017-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2023 2:06:26 PM
Creation date
6/3/2020 9:56:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2017-2018
RECORD_ID
PR0232397
PE
2361
FACILITY_ID
FA0003978
FACILITY_NAME
KAISER FOUNDATION - MANTECA
STREET_NUMBER
1777
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95337
APN
20018034
CURRENT_STATUS
01
SITE_LOCATION
1777 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\Y\YOSEMITE\1777\PR0232397\RETROFIT PLAN 2017.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
310
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(3) Support Fittings Fill. Where <br />one or more fixture studs or hickeys <br />are present in the box, a single volume <br />allowance in accordance with Table <br />370-16(b) shall be made for each type <br />of fitting based on the largest conductor <br />present in the box. <br />(4) Device or Equipment Fill. For <br />each yoke or strap containing one or <br />more devices or equipment, a double vol- <br />ume allowance in accordance with Table <br />370-16(b) shall be made for each yoke or <br />strap based on the largest conductor con- <br />nected to a device(s) or equipment sup- <br />ported by that yoke or strap. <br />(5) Equipment Grounding <br />Conductor Fill. Where one or more <br />equipment grounding conductors or <br />equipment bonding jumpers enters <br />a box, a single volume allowance in <br />accordance with Table 370-16(b) shall <br />be made based on the largest equipment <br />grounding conductors, as permitted by <br />Section 250-146(d), is present in the <br />box, and additional volume allowance <br />shall be made based on the largest <br />equipment grounding conductor in the <br />additional set. <br />Article 410-57(b) Wet Locations <br />(b) Wet Locations. A receptacle <br />installed in a wet location where the <br />product intended to be plugged into it is <br />not attended while in use (e.g., sprinkler <br />system controllers, landscape lighting, <br />holiday lights, etc.) shall have an <br />enclosure that is weatherproof <br />with the attachment plug cap <br />inserted or removed. <br />(2) A receptacle installed in a wet loca- <br />tion where the product intended to be <br />plugged into it will be attended while in <br />use (e.g., portable tools, etc.) shall have <br />an enclosure that is weatherproof when <br />the attachment plug cap is removed. <br />Reprinted with permission from the NFPA 70-1999. National <br />Electrical Code,' Copyright© 1998. National Fire Protection <br />Association, Quincy, MA 02269. This reprinted material is not <br />the complete and official position of the NEPA on the refer- <br />ence subject which is represented only by the standard in its <br />entirety. National Electrical Coda° and NEC' are registered <br />trademarks of the National Fire Protection Association, <br />Quincy, MA. <br />BELL® PRODUCTS: GENERAL <br />FEATURES AND BENEFITS <br />Bell® Weatherproof products all offer <br />these features and benefits: <br />® Rugged seamless die cast construction <br />that will not allow entry of moisture <br />• Reinforced connector outlets to <br />provide a secure mechanical <br />installation <br />® State-of-the-art powder coat paint for <br />maximum weatherability and scratch <br />resistance <br />® Multi-lingual instructions provided <br />with every product <br />® Installation hardware and ground <br />screws included where applicable <br />® Shrink-wrap packaging that keeps <br />all components together <br />® UPC -A barcoding to help lower <br />transaction costs <br />Refer to the following pages for more <br />specific information ou cts <br />rpm <br />P C <br />FEE 2017 <br />-TASHEALTH <br />t <br />DEPARTMENT <br />182 <br />
The URL can be used to link to this page
Your browser does not support the video tag.