My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1989-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MICHAEL CANLIS
>
7000
>
2300 - Underground Storage Tank Program
>
PR0232437
>
COMPLIANCE INFO_1989-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 12:52:20 AM
Creation date
6/3/2020 9:57:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1989-2008
RECORD_ID
PR0232437
PE
2361
FACILITY_ID
FA0003787
FACILITY_NAME
SHERIFFS OPERATIONS CTR #1
STREET_NUMBER
7000
Direction
N
STREET_NAME
MICHAEL CANLIS
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19305014
CURRENT_STATUS
01
SITE_LOCATION
7000 N MICHAEL CANLIS RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232437_7000 N MICHAEL CANLIS_1989-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
427
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIN COUNTY SHERIFF'S OPERATION CENTER(HONOR FARM) <br /> VEHICLE FUELING FACILITY <br /> 1) SCOPE OF WORK TO BE ACCOMPLISHED: DEMOLISH, LOAD AND <br /> DISPOSE OF 8' X 9' 6" AREA OF CONCRETE OVER TANK. ESCAVATE TO TOP <br /> OF TANK, REMOVE AND REPLACE INTERSTITIAL RISER, REMOVE <br /> ELECTRICAL FITTINGS, FURNISH AND INSTALL EXPLOSION PROOF <br /> JUNCTION BOX IN LIEU OF FITTINGS TO FACILLITATE FUTURE TESTING OF <br /> INTERSTITIAL SPACE. PERFORM VACUUM TEST TO VALIDATE WORK <br /> PERFORMED. BACKFILL ESCAVATED AREA, DOWELL EXISTING CONCRETE <br /> WITH REBAR AND REPLACE DEMOLISHED CONCRETE WITH LIKE KIND. <br /> SCHEDULE AND COORDINATE THIRD PARTY SB989 TESTING. <br /> NOTE: IF ABOVE REPAIRS ARE UNSUCCESSFUL THEN ESCAVATE OPPOSITE <br /> END OF TANK TO EXPOSE AND PLUG INTERSTITIAL VENT LINE TO <br /> FACILLITATE TESTING OF INTERSTITIAL SPACE. IF THIS TESTING IS <br /> UNSUCCESSFUL, THEN ESCAVATE, AND REMOVE AND REPLACE <br /> INTERSTITIAL VENT LINE TO FUEL ISLAND. <br /> 2) SCOPE OF WORK TO BE ACCOMPLISHED: REMOVE AND REPLACE <br /> EXISTING PLUMBING AND ELECTRICAL PENETRATION FITTINGS IN DIESEL <br /> SUMP. PERFORM LAKE TEST TO VALIDATE WORK PERFORMED. <br /> SCHEDULE AND COORDINATE THIRD PARTY SB989 TESTING. <br />
The URL can be used to link to this page
Your browser does not support the video tag.