Laserfiche WebLink
SAN JOAQUIN COUNTY SHERIFF'S OPERATION CENTER(HONOR FARM) <br /> VEHICLE FUELING FACILITY <br /> 1) SCOPE OF WORK TO BE ACCOMPLISHED: DEMOLISH, LOAD AND <br /> DISPOSE OF 8' X 9' 6" AREA OF CONCRETE OVER TANK. ESCAVATE TO TOP <br /> OF TANK, REMOVE AND REPLACE INTERSTITIAL RISER, REMOVE <br /> ELECTRICAL FITTINGS, FURNISH AND INSTALL EXPLOSION PROOF <br /> JUNCTION BOX IN LIEU OF FITTINGS TO FACILLITATE FUTURE TESTING OF <br /> INTERSTITIAL SPACE. PERFORM VACUUM TEST TO VALIDATE WORK <br /> PERFORMED. BACKFILL ESCAVATED AREA, DOWELL EXISTING CONCRETE <br /> WITH REBAR AND REPLACE DEMOLISHED CONCRETE WITH LIKE KIND. <br /> SCHEDULE AND COORDINATE THIRD PARTY SB989 TESTING. <br /> NOTE: IF ABOVE REPAIRS ARE UNSUCCESSFUL THEN ESCAVATE OPPOSITE <br /> END OF TANK TO EXPOSE AND PLUG INTERSTITIAL VENT LINE TO <br /> FACILLITATE TESTING OF INTERSTITIAL SPACE. IF THIS TESTING IS <br /> UNSUCCESSFUL, THEN ESCAVATE, AND REMOVE AND REPLACE <br /> INTERSTITIAL VENT LINE TO FUEL ISLAND. <br /> 2) SCOPE OF WORK TO BE ACCOMPLISHED: REMOVE AND REPLACE <br /> EXISTING PLUMBING AND ELECTRICAL PENETRATION FITTINGS IN DIESEL <br /> SUMP. PERFORM LAKE TEST TO VALIDATE WORK PERFORMED. <br /> SCHEDULE AND COORDINATE THIRD PARTY SB989 TESTING. <br />