Laserfiche WebLink
1 <br /> E"N MODELDouble-Wall Tar <br /> DWT-2S(8)6000 Short Form Specincation: <br /> 811 R With The contractor shall provide U.L.—labeled <br /> Double-Wall FiberglasO underground <br /> 120® +++ Standard storage tanks In sizes and with fittings as <br /> F Monitor Fitting Fittings shown on the drawings.The tanks shall be <br /> Between Ribs 1 &2 Shown manufactured by Owens-Corning Fiberglas. <br /> 2'31/2►' 3'21/2"i•-3r " 2'9°' ThiS End Only Tanks shall be tested and installed with pea <br /> 11°` gravel or approved anemate backfill <br /> " A I <br /> TR <br /> 3 n material according to the current installation <br /> 5 I 3/s Instructions(Owens-Corning Fiberglas <br /> 94 ri Publication 3-PE-6304 and 3-PE-12681) <br /> provided with the tank. <br /> 1 G 60-4 1 Monitoring Capabilities <br /> T8°° I.D. l continuous <br /> condi- <br /> 821/2" H H 8'1°° ions arThe e compatible with he cavity between <br /> 7'111/4" Bf C the inner and outer tank: <br /> O.D. a Vented to atmosphere " <br /> i e Sealed tank cavity <br /> Clearance between inner and outer <br /> wall............................11A' <br /> 1 4'10" 1011" 4'10°' <br /> 19'9" GoverningStandards: <br /> 1.ASTM Specification D4021-81.Glass <br /> Fiber Reinforced Polyester Underground <br /> 1.Hold down strap rib locations are Indicated by arrows►a 3.Fittings are centered on an B"radius from the center of the mamvay cover Petroleum Storage Tanks. <br /> 2.For information and limitations on accessory locations on tanks,refer and spwO 120 degrees apart or 81 open on axial line. 2,U.L.1316.Underwriters Laboratories, <br /> to current issue of Pub.No.3-PE-14M"Double Wall Tanks" Inc.,Glass Fiber Reinforced Plastic <br /> MK SIZE No. ITEM POSITION/NOTES Underground Storage Tanks for <br /> A 22° 1 rr.rtwsy, Asshown Petroleum Products. <br /> 3.National Fire Protection Assoc. <br /> W i <br /> J B 24"Sq, t DensctorPlats As storm (NFPA 30)Flammable and Combustible <br /> C 12°x36" t DetlectorPlats Asshown Liquids Codeand(NFPA31)Standards <br /> for Installation of Oil Burning Equipment. <br /> = D 4° a NPTFIttIrNp Atom to primary sank 4.Factory Mutual FileJ.I.OK6AF.A5 <br /> V5.National Sanitation Foundation Testing <br /> N E xe"Diem. 1 Msmway cover Laboratory,January 1984,listing of <br /> ZF 4° 3 NPT Fittings on Manway cover Ptg's.on 6"radfus 61x0•spacing Plastic Piping System Components and <br /> _ Related Materials,Standard 15. <br /> F- ® — 2 LIR Lugs center 6.Military Specification MIL-T-52777A, <br /> ~ 4"weds dated July 6,1978,Tanks,Storage, <br /> ty, H 2Tidek 2 Bumper Pads As shown <br /> " <br /> Underground,Glass Fiber Reinforced <br /> 1 4° 2 NPTMp Annular space access only Plastic. <br /> 7.General Services Administration,Public <br /> CUSTOMER ,San DEST1NATfoN 6 METHOD Building Service Guide Specification, <br /> PBS:1568. ;E <br /> RECOMMENDED SERVICE V DRWG NO. <br /> 1, <br /> QUANTITY MODEL ACTUALCAPACITY <br /> i <br /> DWT-2S(8)6000 5930 Gallons <br /> APPROX.WEIGHT APPROX.CAVITY VOLUME CUSTOMER DRAWING NO. <br /> 1 <br /> 3400 Lbs. <br /> PREPARED BY TELEPHONE NO. REVISION DATE <br /> CHKO <br /> In U.S.A.,February,Igoe Copyright 471 gas Owens-Coming Fiberglas Corporation j <br />