Laserfiche WebLink
NOTES <br />1. All equipment must perform properly before project is considered complete. <br />2. All work to comply with local, state, and federal codes, and health and safety <br />regulations. <br />3. Contractor must possess and provide copies of all required licenses, permits, bonds, <br />liability insurance, and workman's compensation insurance. <br />4. Contractor to comply with prevailing wage regulations. <br />ACCEPTABLE EXCLUSIONS <br />1. Engineered drawings. <br />2. Coordinate/hire third party for soil samples and analyses. <br />3 . Over engineering if contamination found. <br />4. Haul off contaminated soil, if found. <br />5. Coordinatelhire third party testing to comply with ST27 & ST30 requirements. <br />Install Fuel Dispenser Containment Bid # 6072 <br />December 18, 2003 Page 34 of 34 <br />