My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1989-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MICHAEL CANLIS
>
7000
>
2300 - Underground Storage Tank Program
>
PR0232437
>
COMPLIANCE INFO_1989-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 12:52:20 AM
Creation date
6/3/2020 9:57:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1989-2008
RECORD_ID
PR0232437
PE
2361
FACILITY_ID
FA0003787
FACILITY_NAME
SHERIFFS OPERATIONS CTR #1
STREET_NUMBER
7000
Direction
N
STREET_NAME
MICHAEL CANLIS
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19305014
CURRENT_STATUS
01
SITE_LOCATION
7000 N MICHAEL CANLIS RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232437_7000 N MICHAEL CANLIS_1989-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
427
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
44ov OG 03 02s37p GBldgs. <br />. 0. <br />(2('468-4757 p.4 <br />WRITTEN MONITORING AND RESPONSE PLAN <br />UNDERGROUND STORAGE: '1 ANIS MONITORING PROGRAM <br />This monitoring program must be kept at the UST location at all times. The infonnation on this monitoring program are <br />conditions of the operating permit. The permit holder must notify Environmental Health Department, (209) 468-3420 <br />%viithin 30 days of any changes to the monitoring procedures, unless required to obtain approval or a 9crmit before making <br />the change. Required by CCR 2632 (d) and 2641 (h). <br />FACILITY NAME Sheriff's erations Ctr. & .iaal Com lex DATE 11-6--03 <br />FACILITY ADDRESS 7000 Michael 13. Canlie Blvd. > Frencb t'Atil). CA 95231 <br />I.Name(s) and Title(s) of the people responsible for pCrfurutiug the monitoring and/or maintenance <br />BobCawelti, Dist. riaint. & Const. Su t. <br />Tom Valtierra, Electrician ' <br />2.Describe the frequency of performing the monitoring for: <br />TANICS Continuous <br />PIPING Gvutinuvus <br />3.Describe the location(s) of where the monitoring will be performed, ie. location of sensors <br />auildin 16 Central 1'L nt Emer enc enerator a ui ent ro m• <br />4. Describe the follotiving equipment for each underground storage tank. <br />Name and Model of Monitoring; Panel Universal Sensors & Devices, Inc. -- Mod. LA -X4 <br />Name and Model of Line leak Detectors NIA <br />Name and Model of Annular Sensors Universal sensors & Devices, Inc. -- Mod. LALS-1 <br />ing Sensors <br />and Model of PipUniversal Sensors & Devises, Inc. -� Mod. LAYS -1 <br />Name and Model of Dispenser Sensors VA <br />Type of overfill prevention <br />5.170 the'l'urbine Sensors and Dispenser Pari Se lSOrS shut down the turbine? Yes (J No G N/A <br />Does the turbine shut down if a sensor is disconnected? Yes 0 NoC) NIA <br />Does the turbine shut down is the monitoring panel loses power? Yes C] No Cl <br />6,13ow will the alarm history and subsequent maintenance be recorded? <br />in the Plant Entaineerine repair and maintenance coni uter located at the Plant <br />r En ineerin Office at the Sheri's Central Services Bldg- <br />ff <br />7_Maintenance of the monitoring equipment must be performed at least once every 12 months. <br />Describe the preventive maintenance schedule and recording for the monitoring equipment. What month will <br />annual monitoring certification be performed in? Annually - October — <br />Note. For new installations the secondary containment must be tested 6 months after installation. All secondary containment systems <br />must be tasted once every 36 months with initial testing performed before January 1, 2003, <br />8. Describe the training necessary for the operation of UST system, including piping, and the monitoring <br />equipment. Current as-b,►i 1 t drawings and 0 orator' s Manual <br />[:\Unit III\US'[\tnonitorin9p131'.doc <br />4,1t�_Oo3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.