Laserfiche WebLink
SWRCB. January 2002 Page 4 of 7 <br />6. PIPING SUMP TESTIN <br />AO <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />ALL PIPING & ELECTRICAL PENATRATIONS WERE RESEALED USING A.O. <br />SMITH FIBERGLASS PRODUCTS & ALLOW TO CURE BEFORE TESTING <br />I If the entire depth of the sump is not tested, specify how much was tested. If the answer to ggy of the questions indicated with an asterisk (*) is "NO" or <br />"NA", the entire sump must be tested. (SWRCB LG -160) <br />Test Method Developed By: [ ] Sump Manufacturer [ X ] Industry Standard [ ] Professional Engineer <br />[ ] Other (Specify) <br />Test Method Used: [ ] Pressure [ ] Vacuum [X ] Hydrostatic <br />Other S eci <br />Test Equipment Used: CALDWELL LEVEL GAUGE <br />E ui ment Resolution: 0.0025 <br />Sump # DIESEL ".._.. <br />Sump # UNLEAD GAS <br />Sump # <br />Sump Diameter: <br />36 INCH <br />36 INCH <br />Sump Depth: <br />24 INCH <br />24 INCH <br />Sump Material: <br />FIBERGLASS <br />FIBERGLASS <br />Height from Tank Top to <br />Top of Highest Piping <br />10 INCH <br />11-1/2 INCH <br />Penetration: <br />Height from Tank Top to <br />Lowest Electrical <br />17 INCH <br />19 INCH <br />Penetration: <br />Condition of sump prior to <br />DRY <br />DRY <br />testing: <br />Portion of Sump Tested <br />18 INCH <br />19 INCH <br />Does turbine shut down <br />[ ] YES [X] NO <br />[ ] YES [X] NO <br />[ ] YES [ ] NO <br />when sump sensor detects <br />[ ] NA <br />[ ] NA <br />[ ] NA <br />liquid (both product & <br />NOT A TURBINE, <br />NOT A TURBINE, <br />water)? <br />BUT A PUMP <br />BUT A PUMP <br />Turbine shutdown response <br />time: <br />30 SECONDS <br />30 SECONDS <br />Is system programmed for <br />[ ] YES [X] NO <br />[ ] YES [X] NO <br />[ ] YES [ ] NO <br />fail-safe shutdown? <br />NA <br />NA <br />NA <br />Was fail-safe verified to be <br />[ ] YES [X] NO <br />[ I YES [X] NO <br />[ ] YES [ ] NO <br />operational? <br />r ] NA <br />[]NA <br />NA <br />Wait time between applying <br />pressure/vacuum/water and <br />FIVE MINUTES <br />FIVE MINUTES <br />starting test: <br />Test Start Time: <br />8:40 A.M. 2-11-03 <br />10:55 A.M. 2-11-03 <br />Initial Reading (Rl): <br />18 INCH <br />19 INCH <br />Test End Time: <br />9:40 A.M. 2-11-03 <br />11:55 A.M. 2-11-03 <br />Final Reading (Rf): <br />18 INCH <br />19 INCH <br />Test Duration: <br />ONE HOUR <br />ONE HOUR <br />Change in Reading (Rf-R1) <br />-0- <br />-0- <br />Pass/Fail Threshold or <br />Less than 1/4 drop over 24 <br />Less than 1/4 drop over 24 <br />Criteria: <br />hours <br />hours <br />Test'Result:X <br />jPASS FAIL <br />X PASS FAIL <br />PASS [ FAIL <br />Was sensor removed for <br />[X ] YES [ ] NO <br />[X] YES [ ] NO <br />[ ] YES [ ] NO <br />testing? <br />] NA <br />NA <br />NA <br />Was sensor properly <br />replaced and verified <br />[X] YES [ ] NO <br />[X] YES [ ] NO <br />[ ] YES [ ] NO <br />functional after testing? <br />[ ] N/A <br />[ ] N/A <br />[ ] N/A <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />ALL PIPING & ELECTRICAL PENATRATIONS WERE RESEALED USING A.O. <br />SMITH FIBERGLASS PRODUCTS & ALLOW TO CURE BEFORE TESTING <br />I If the entire depth of the sump is not tested, specify how much was tested. If the answer to ggy of the questions indicated with an asterisk (*) is "NO" or <br />"NA", the entire sump must be tested. (SWRCB LG -160) <br />