Laserfiche WebLink
SWRCB. January 2002 Page 5 of 7 <br />7. R -DISPENSER CONTAINMENT C) TESTING <br />Test Method Developed By: <br />[ <br />] UDC Manufacturer [ ] Industry Standard [ ] Professional Engineer <br />[ <br />] Other (Specify) <br />Test Method Used: <br />[ <br />] Pressure <br />[ <br />] Vacuum <br />[ ] Hydrostatic <br />[ <br />] Other (Specify) <br />Test Equipment Used: <br />Equipment <br />Resolution: <br />._.. �.. <br />UDC # <br />UDC # <br />UDC # <br />UDC Manufacturer: <br />UDC Material: <br />UDC Depth: <br />Height from UDC <br />Bottom to Top of <br />Highest Piping <br />Penetration: <br />Height from UDC <br />Bottom to Lowest <br />Electrical Penetration: <br />Condition of UDC <br />prior to testing: <br />Portion of UDC <br />Tested 1 <br />Does turbine shut down <br />[ ] YES [ ] NO <br />[ ] YES [ ] NO <br />[ ] YES [ ] NO [ ] NA <br />when UDC sensor <br />[ ] NA <br />[ ] NA <br />detects liquid (both <br />product & water)? <br />Turbine shutdown <br />response time: <br />Is system programmed <br />[ ] YES [ <br />] NO <br />[ ] YES[ <br />] NO <br />[ ] YES [ ] NO <br />for fail-safe shutdown? <br />[ ] NA <br />NA <br />[ NA <br />Was fail-safe verified <br />[ ] YES [ <br />] NO <br />[ ] YES [ <br />] NO <br />[ ] YES [ ] NO <br />to be operational? <br />[ ] NA <br />[ ] NA <br />[ ] NA <br />Wait time between applying <br />pressure/vacuum/water & <br />starting test <br />Test Start Time: <br />Initial Reading (R1): <br />Test End Time: <br />Final Reading <br />Test Duration: <br />Change in Reading (Rf- <br />RI) <br />Pass/Fail Threshold or <br />Criteria: <br />Test Result,'' <br />PASS <br />I FAIL <br />I I PASS <br />I I 1FAIL <br />PASS I I FAIL <br />Was sensor removed for <br />[ ] YES [ <br />] NO <br />[ ] YES <br />[ ] NO <br />[ ] YES [ ] NO <br />testing? <br />[ ] N/A <br />] N/A <br />Was sensor properly <br />[ ] YES [ <br />] NO <br />[ ] YES <br />[ ] NO <br />[ ] YES [ ] NO <br />replaced and verified <br />[ ] N/A <br />[ ] N/A <br />[ ] N/A <br />functional after test? <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />I If the entire depth of the UDC is not tested, specify how much was tested. If the answer to any of the questions indicated with an asterisk (*) is "NO" or <br />"NA", the entire sump must be tested. (SWRCB LG -160) <br />