My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1989-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MICHAEL CANLIS
>
7000
>
2300 - Underground Storage Tank Program
>
PR0232437
>
COMPLIANCE INFO_1989-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 12:52:20 AM
Creation date
6/3/2020 9:57:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1989-2008
RECORD_ID
PR0232437
PE
2361
FACILITY_ID
FA0003787
FACILITY_NAME
SHERIFFS OPERATIONS CTR #1
STREET_NUMBER
7000
Direction
N
STREET_NAME
MICHAEL CANLIS
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19305014
CURRENT_STATUS
01
SITE_LOCATION
7000 N MICHAEL CANLIS RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232437_7000 N MICHAEL CANLIS_1989-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
427
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB. January 2002 <br />Page 3 of 7 <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />Piping Run #1 <br />Piping Run #2 <br />Pipin2 #3 Piping Run # <br />Piping Material: <br />FIBERGLASS <br />FIBERGLASS <br />FIBERGLASS <br />Piping Manufacturer: <br />SMITH <br />SMITH <br />SMITH <br />Piping Diameter: <br />3" <br />3" <br />3" <br />Length of Piping Run: <br />15' <br />20' <br />8' <br />Product Stored: <br />UNLEAD PRODUCT <br />VENT UNLEAD <br />DIESEL PRODUCT <br />Method and location of <br />piping -run isolation: <br />TEST BOOT <br />TEST BOOT <br />TEST BOOT <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />5 MINUTES <br />5 MINUTES <br />5 MINUTES <br />Test Start Time: <br />9:55 AM <br />11:15 AM <br />1:35 PM <br />Initial Reading (R1) <br />4.0 LBS <br />4.0 LBS <br />4.0 LBS <br />Test End Time: <br />11:06 AM <br />12:15 PM <br />1:45 PM <br />Final Reading (Rf): <br />4.0 LBS <br />4.0 LBS <br />4.0 LBS <br />Test Duration: <br />ONE HOUR <br />ONE HOUR <br />ONE HOUR <br />Change in Reading (Rf-R1) <br />-0- <br />-0- <br />-0- <br />Pass/Fail Threshold or <br />Criteria: <br />Test Result: <br />X I Pass I Fail <br />X I Pass I I> Fail <br />[X]Pass[ Fail Pass Fail' <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.