My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1989-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MICHAEL CANLIS
>
7000
>
2300 - Underground Storage Tank Program
>
PR0232437
>
COMPLIANCE INFO_1989-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 12:52:20 AM
Creation date
6/3/2020 9:57:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1989-2008
RECORD_ID
PR0232437
PE
2361
FACILITY_ID
FA0003787
FACILITY_NAME
SHERIFFS OPERATIONS CTR #1
STREET_NUMBER
7000
Direction
N
STREET_NAME
MICHAEL CANLIS
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19305014
CURRENT_STATUS
01
SITE_LOCATION
7000 N MICHAEL CANLIS RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232437_7000 N MICHAEL CANLIS_1989-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
427
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB. January 2002 0 <br />Page 4 of 7 <br />6. PIPING SUMP TESTING <br />Test Method Developed By: [ ] Sump Manufacturer [ X ] Industry Standard [ ] Professional Engineer <br />[ ] Other (Specify) <br />Test Method Used: [ ] Pressure [ ] Vacuum [ X ] Hydrostatic <br />[ ] Other (Specify) <br />Test Equipment Used: CALDWELL Equipment Resolution: 0.0025 <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />#1 FAILED LAKE TEST IN FIRST TEN (10) MINUTES OF TEST. <br />#2 FAILED LAKE TEST IN FIRST TWENTY (20) MINUTES OF TEST. <br />1 If the entire depth of the sump is not tested, specify how much was tested. If the answer to gny of the questions indicated with an asterisk (*) is "NO" or <br />"NA", the entire sump must be tested. (SWRCB LG -160) <br />Sump # UNLEAD <br />Sump # DIESEL <br />Sump # <br />Sump # <br />Sump Diameter: <br />36 INCH <br />36 INCH <br />Sump Depth: <br />24 INCH <br />24 INCH <br />Sump Material: <br />Height from Tank Top to Top <br />of Highest Piping Penetration: <br />10 INCH <br />10 INCH <br />Height from Tank Top to <br />Lowest Electrical Penetration: <br />17 INCH <br />16 INCH <br />Condition of sump prior to <br />testing: <br />DRY <br />DRY <br />Portion of Sump Tested <br />Does turbine shut down when <br />sump sensor detects liquid <br />both product & water)? <br />[ X ] Yes [ ] No [X ] NA <br />[ ] Yes [ ] No [ X] NA <br />[ ] YES [ ] NO [ INA <br />[ ] YES [ ] NO [ ] NA <br />Turbine shutdown response time: <br />Is system programmed for <br />fail-safe shutdown? <br />[X ] YES [ ] NO 1 X] NA <br />[ ] YES[ ] NO [X ] NA <br />[ ] YES [ ]NO[ ] NA <br />[ ] YES [ ] NO [ INA <br />Was fail-safe verified to be <br />operational? <br />[ X] YES [ ] NO [X] NA <br />[ ] YES [ ] NO [ X ] NA <br />[ ] YES [ ] NO [ INA <br />[ ] YES [ ] NO [ INA <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />Test Start Time: <br />11:30 AM <br />11:40 AM <br />Initial Reading (RI): <br />Test End Time: <br />REFER TO <br />REFER TO <br />Final Reading (Rf): <br />COMMENTS #1 <br />COMMENTS #2 <br />Test Duration: <br />BELOW <br />BELOW <br />Change in Reading (Rf-R1) <br />Pass/Fail Threshold or <br />Criteria: <br />Test Result: <br />I Pass ..FajI <br />I I Pass X1 Fail <br />I I Pass I Fail <br />I I Pass I Fail <br />Was sensor removed for testing? <br />X Yes No N/A <br />[XYes No N/A <br />Yes No N/A <br />Yes No[ JN/A <br />Was sensor properly replaced <br />and verified functional after <br />testing? <br />IX ] Yes [ ] No [ ]N/A <br />[X ] Yes [ ] No [ ]N/A <br />[ ] Yes [ ]No[ ]N/A <br />[ ] Yes [ ]No[ ]N/A <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />#1 FAILED LAKE TEST IN FIRST TEN (10) MINUTES OF TEST. <br />#2 FAILED LAKE TEST IN FIRST TWENTY (20) MINUTES OF TEST. <br />1 If the entire depth of the sump is not tested, specify how much was tested. If the answer to gny of the questions indicated with an asterisk (*) is "NO" or <br />"NA", the entire sump must be tested. (SWRCB LG -160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.