My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1989-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MICHAEL CANLIS
>
7000
>
2300 - Underground Storage Tank Program
>
PR0232437
>
COMPLIANCE INFO_1989-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 12:52:20 AM
Creation date
6/3/2020 9:57:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1989-2008
RECORD_ID
PR0232437
PE
2361
FACILITY_ID
FA0003787
FACILITY_NAME
SHERIFFS OPERATIONS CTR #1
STREET_NUMBER
7000
Direction
N
STREET_NAME
MICHAEL CANLIS
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19305014
CURRENT_STATUS
01
SITE_LOCATION
7000 N MICHAEL CANLIS RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232437_7000 N MICHAEL CANLIS_1989-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
427
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2062 Page of <br /> 9. SPIELL/OVERFILL CONT ENT BOXES <br /> Facility is Not Egui ed With Spill/Overfill Containment Boxes 0 <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested <br /> Test Method Developed By:. Spill Bucket Manufacturer D Industry Standard D Professional Engineer <br /> 0 Other(Specify) <br /> Test Method Used:, 0 Pressure 0 Vacuum 0 Hydro <br /> l, <br /> 0 Other(Spec) <br /> Test Equipment Used: Equipment Resohition: <br /> Spill # Spill Box# pill Box# Spill Box# <br /> Bucket Diameter: <br /> Bucket Depth: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> qartlM test: <br /> Test Start Time: <br /> Initial Reading W: <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: ° <br /> Change in Readin -Rj : <br /> Pass/Fail thomld or <br /> Criteria: <br /> Test exults 0 Pass 0 Fall 0 Pass ®fail ® *ass 0 Fall 0 Pass 0 Fail <br /> Comments— include information on repairs made prior to testing and recomm for failed tests <br /> 04, <br /> t <br />
The URL can be used to link to this page
Your browser does not support the video tag.