Laserfiche WebLink
r, <br /> SAN JOAQUIN COUNTY ENVIRONMENTAL HEALTH DEPARTMENT <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-PAGE 1 FEB 2 3 2004 <br /> M01. <br /> TYPE OF ACTION ❑ 1.NEW PLAN El 2.CHANGE OF INFORMATION <br /> PLAN TYPE ❑ MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. n r ENVIRONMENT <br /> IRI <br /> (Check one item only) ❑ THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S) Y '? <br /> ICES <br /> TIT I Ll <br /> FACILITY ID#(Agency Use Only) <br /> /� g �.,, �y S O M03. <br /> FACILITY NAME i�" ( 6l / <br /> ° CITY gj0ek <br /> FACILITY SITE ADDRESS 7 3- . <br /> 3M04A e s <br /> State law requires that testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)be performed in M06. <br /> accordance with the equipment manufacturers'instructions,or annually,whichever is more frequent. Such work must be performed by qualified personnel. MOT <br /> MONITORING EQUIPMENT IS SERVICED 1.ANNUALLY ❑ 99.OTHER(Specify): <br /> This monitoring plan must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed(i.e.,location of each sensor, <br /> line leak detector,monitoring system control panel,etc.). Ifycu already have a diagram(e.g.,current UST Monitoring Site Plan from a Monitoring System Certification <br /> form,Hazardous Materials Business Plan map,etc.1 which shows all required information,include it with this plan. <br /> MIO. <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S):(Check all that apply) <br /> J 1.CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) Mt l <br /> SECONDARY CONTAINMENT IS: 16 a.DRY ❑ b.LIQUID FILLED ❑ c.UNDER PRESSURE ❑ d.UNDER VACUUM <br /> M12. MODEL M13. <br /> PANEL MANUFACTURER: V w <br /> M15. <br /> LEAK SENSOR MANUFACTURER: Z,6EQE& l�J 3P M14. MODEL#(S): 0 <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TA mt K(S) MIS. <br /> PANEL MANUFACTURER: MODEL#: <br /> Mia MODEL#(S): M19. <br /> IN-TANK PROBE MANUFACTURER: hLo. <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY <br /> OTHER(Specify): M21. <br /> e. ( <br /> ❑ d.MONTHLY ❑ pe Y)� <br /> M22. AL3. <br /> PROGRAMMED TESTS: Ela.0.1 g.p.h. El b.0.2 g.p.h. ❑ c.OTHER(Specify): <br /> hL4. <br /> ❑ 3.INVENTORY RECONCILIATION ❑ a.MANUAL PER 23 CCR§2646 ❑ b.STATISTICAL PER 23 CCR§2646.1 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)PER 23 CCR§2645 M75 <br /> TESTING PERIOD: E] a.36 HOURS ❑ b.60 HOURS <br /> ❑ 5.INTEGRITY TESTING PER 23 CCR§2643.1 M26 M27 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): <br /> ❑ 6.VISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY(Requires agency approval) <br /> M26. <br /> ❑ 99.OTHER(Specify): <br /> M3o.' <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) <br /> 1.CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(Sy/TRENCH(ES)AND OTHER SECONDARY CONTAINMENT M31 <br /> SECONDARY CONTAINMENT IS: 29 a.DRY ❑ b.LIQUID FILLED ❑ c.UNDER PRESSURE ❑ d.UNDER VACUUM <br /> PANEL MANUFACTURER: v �_� M32. MODEL#: <br /> M34. MODEL#(S): - M35. <br /> LEAK SENSOR MANUFACTURER:V +. / M36 <br /> WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN? ❑ a.YES El b.NO <br /> WILL FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO M32 <br /> ❑ 2.MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED M38 M39. <br /> MLLD MANUFACTURER(s): MODEL#(S): <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS <br /> ELLD MANUFACTURER: <br /> M40 MODEL#: M41. <br /> M42. <br /> PROGRAMMED LINE INTEGRITY TESTS: Ela.MINIMUM MONTHLY 0.2 g.p.h. Elb.MINIMUM ANNUAL 0.1 g.p.h. <br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO <br /> hf43. <br /> WILL ELLD FAILURE/DISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO <br /> M44. <br /> ❑ 4.INTEGRITY TESTING M45. M46, <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) <br /> ❑ 5.VISUAL MONITORING DONE: ❑ a.DAILY ❑res WEEKLY* ..Allo❑for monitoc. ring of buried emergency generTHLY&EACH ator fuel piping onE SYSTEM ly per HSCn§25281.5(bx3) <br /> Requires agency aPP <br /> ❑ 6.PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR§2636(ax3) <br /> ❑ 7.NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) Mas. <br /> ❑ 99.OTHER(Specify) <br /> 07/23/03 <br /> SJCERD-d(07/03)-1/4 <br />