Laserfiche WebLink
1 , ` <br /> r <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-PAGE 2 <br /> MONITORING OF AREAS BENEATH DISPENSER(S)IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) <br /> ❑ 1.CONTINUOUS ELECTRONIC MONITORING OF UNDER DISPENSER CONTAINMENT(UDC) M52. <br /> MODEL#: <br /> PANEL MANUFACTURER: M53. MODEL#(S): M54. <br /> LEAK SENSOR MANUFACTURER: Mss <br /> WILL DETECTION OF A LEAK INTO THE UDC TRIGGER AUDIBLE AND VISUAL ALARMS? ❑ a.YES El b.NO M56. <br /> WILL A UDC LEAK ALARM TRIGGER AUTOMATIC PUMP SHUTDOWN? M57 <br /> WILL FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES C1 b.NO <br /> ❑ 2.MECHANICAL ASSEMBLY(e.g.,FLOAT AND CHAIN ASSEMBLY)IN UDC TRIPS SHEAR VALVE IN CASE OF LEAK M59 <br /> ASSEMBLY MANUFACTURER: M58. MODEL#(S): <br /> M60. <br /> ❑ 3.VISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY(Requires agency approval) <br /> ❑ 4.NO DISPENSERS M61. <br /> ❑ <br /> 99.OTHER(Specify) <br /> M70. <br /> ❑ I. B HAVE BEEN NOTIFIED BY ThE STATE WATER PWS.3URCES CC.NTROL nOP.PD T�IAT WE)vfUST IMPLEMENT ENHANCED LEAK <br /> W <br /> DETECTION(ELD)FOR THE UST(S)COVERED BY THIS PLAN.PER 23 CCR§2644.1,ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED <br /> r ' <br /> M80. <br /> REFE NCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> 1, [THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) <br /> 2. �' OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required) <br /> 3. ❑ THE FACILITY'S BEST MANAGEMENT PRACTICES(Required as of 7/1/2004) <br /> 4. ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS <br /> 5. ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW <br /> 6. ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS MANUAL AND <br /> - <br /> STATISTICAL INVENTORY RECONCILIATION" <br /> 7. ❑ SWRCB PUBLICATION:"WEEKLY MANUAL TANK GAUGING FOR SMALL UNDERGROUND STORAGE TANKS" M81 <br /> 99.❑ OTHER(Specify): <br /> Personnel with UST monitoring responsibilities are familiar with all of the above documents relevant m their job duties and can access those documents when needed. <br /> By this facility will have a"Designated UST Operator"who has passed the operator exam administered by the International Code Council(ICC). By <br /> ®@ and annually thereafter,the "Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems.This <br /> training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices. <br /> The facility employee's role with regard to the leak detection equipment. <br /> ➢ The facility employee's role with regard to spills and overfills. <br /> ➢ Whom to contact for emergencies and leak detection alarms. 19 <br /> For facility employees hired on or after July 1,2004,the initial training will be conducted within 30 days of the date of hire. <br /> M85. <br /> Please use this section to include any additional UST system monitoring-related information(e.g.,additional information required by your local agency): <br /> PER <br /> UST PERATING PERMIT <br /> R"IDENTIFIED IN <br /> AS OF 7/1/2004,THE"DESIGNATT TEOUTHORITY OR PERFORMING SECTION <br /> THE MONITORING ACTIVITIES AND MAINTAINING LEAKPDE DETECTION <br /> FACNT <br /> ILITY FORM WILL HAVE UL <br /> EQUIPMENT COVERED BY THIS PLAN,AND WILL PERFORM AND DOCUMENT MINIMUM MONTHLY VISUAL INSPECTIONS OF THE FACILITY' <br /> UST SYSTEMS IN ACCORDANCE WITH 23 CCR§2715(b). <br /> CERTIFICATION:I certify that the information provided herein is true and accurate to the best of my knowledge. 191. <br /> O R/ ERATOR SIGNATURE REPRESENTING DATE: <br /> Owner M90 <br /> . \ .. <br /> ❑Operator �1 M93 <br /> M9z. OWNER/OPERATOR TITLE: <br /> OWNER/ RATOR NA (print): 0A.* iwig <br /> (Agency Use Only) This plan has been reviewed and: ❑Approved ❑Approved With Conditions ❑Disapproved <br /> Date: <br /> Local Agency Signature: <br /> Comments/Special Conditions: <br /> 07/23/03 <br /> SJCEHD-d(07/03)-3/4 <br />