My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MICHAEL CANLIS
>
7000
>
2300 - Underground Storage Tank Program
>
PR0232437
>
COMPLIANCE INFO_2009-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2023 1:25:56 PM
Creation date
6/3/2020 9:57:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2018
RECORD_ID
PR0232437
PE
2361
FACILITY_ID
FA0003787
FACILITY_NAME
SHERIFFS OPERATIONS CTR #1
STREET_NUMBER
7000
Direction
N
STREET_NAME
MICHAEL CANLIS
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19305014
CURRENT_STATUS
01
SITE_LOCATION
7000 N MICHAEL CANLIS RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232437_7000 N MICHAEL CANLIS_2009-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
470
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Nov 12 09 04:56p 20 7-5424 p-6 <br /> 0 <br /> SWRCB,January 2002 page 5— of <br /> 7. UNDER-DISPENSER CONT HENT TESTING <br /> Test Method Developed.By: :1 UDC Manufacturer 0 Industry Standard 0 Professional Engineer <br /> 3 Other(Specify) <br /> Test Method Used: 0 Pressure 0 Vacuum F,Hydrostatic <br /> D-Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> UDC# UDC N UDC# UC <br /> UDC <br /> Equipment Manufacturer: <br /> UDC Material: <br /> 7C <br /> UD Depth: <br /> Height from UDC Bottom to Top <br /> of Highest Piping Penetration., <br /> Heiaht from UDC Bottom to <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to <br /> testing: <br /> Portion of UDC Tested'-__ <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both 0 Yes D No E NA C Yes 0 0 c NA 0 Yes 0 No 3 NA C1 Yes 13 No 0 NA <br /> product and waterj?* <br /> Turbine shutdown response time <br /> is system programmed for fail_ :]Yes DNo ENA :1 No DNA DYes, DNo :INA E]Yes ONo DNA <br /> safe shutdown?* 4 <br /> Was fail-safe verified to be 13 Yes 0 No E NA �s 0 No DNA D Yes 0 No v NA 0 Yes 0 No 0 NA <br /> ooerational?* <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting—test N <br /> Test Start Time: <br /> Initial Reading(Ri): <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> ChanLe in Reading(RF-Ri): <br /> Pass,'Fail Threshold or Criteria: <br /> Test Result: 0 Pass D fail 0 'Pass 0 0 Pus 0 Fail 0 Pass E.Fail <br /> Was sensor removed for testing? DYes ONo :INA [ 3 Yes ONo 0 NA 0 Yes 0 No 0 NA 0 Yes E No 0 NA <br /> Was sensor properly replaced an 0 Yes 0 No 0 NA 3Yes 0 N DNA 0 Yes 0 No 0 NA 0 Yes 1:No DNA <br /> verified functional after testing! <br /> Comments—(include information on repairs made prior to testing and recommendedfollow-upfor ailed tests) <br /> If the entire depth of the UDC is not tested,specify how much was tested. If the answer to p u <br /> y of the questions indicated with an <br /> asterisk(*)is"Wor"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.