My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MICHAEL CANLIS
>
7000
>
2300 - Underground Storage Tank Program
>
PR0232437
>
COMPLIANCE INFO_2009-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2023 1:25:56 PM
Creation date
6/3/2020 9:57:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2018
RECORD_ID
PR0232437
PE
2361
FACILITY_ID
FA0003787
FACILITY_NAME
SHERIFFS OPERATIONS CTR #1
STREET_NUMBER
7000
Direction
N
STREET_NAME
MICHAEL CANLIS
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19305014
CURRENT_STATUS
01
SITE_LOCATION
7000 N MICHAEL CANLIS RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232437_7000 N MICHAEL CANLIS_2009-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
470
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page 3 of- <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ? 'ping Manufacturer 0 Industry Standard 0 Professional Engineer <br /> 0 Other(Specify) <br /> Test Method Used: 'Pressure <br /> 'r essure 0 Vacuum 0 Hydrostatic <br /> /0 Other(Specify) j <br /> Test Equipment Used: fy-5S 14(44 Equipment Resolution: <br /> Piping Run# Piping Run# 2— Piping Run# kiping Run# <br /> Piping Material: 5 f S g <br /> Piping Manufacturer: <br /> Piping Diameter: 3 01 <br /> Length of Piping Run: Av*,we, 30 1 AmLaxa 34 ) A0eom"Y' le) <br /> Product Stored: [ZAP 14 V- �0,j1weVee <br /> A I-eSe C. <br /> Method and location of 7R.4-b,14-a 7::�--r+be <br /> piping-run isolation: a" 0,41we fu&0j A-2— <br /> Walt-time between applying <br /> re sure/ cuum/water and N0 4- -ve S+-e <br /> s <br /> g g test: 5 f OWW-6" S o U,V- V- <br /> Test Start Time: -t 5- <br /> Initial Reading(RO: P 5-1 <br /> Test End Time: 3 <br /> Final Reading(RF): <br /> Test Duration: V- <br /> Change in Reading(RF-RI): <br /> Pass/Fail Threshold or <br /> Criteria: PQ W S S i t, 5 U L.,® 1,t <br /> Test Result: 0 Pass 0 Fail ) *- <br /> .je�ass 0 Fail 12ass 0 Fa ass 0 Fail <br /> r <br /> Comments- include i�rmaflon on repairs made prior to testing, and recommended follow-upforfailed tests) <br /> b nn ci V-LLvt*'I V-g ik�a,( Lu- 4,C7 ��L A--e-5--S-e4 <br /> e K "o-V Rl vP-Lt. LA <br /> f <br /> C. evt C\, A-0 <br /> Y-0 <br /> SA-Ty-A <br />
The URL can be used to link to this page
Your browser does not support the video tag.