Laserfiche WebLink
• <br /> SWRCB,January 2002 Page 14 of <br /> 6. PIDPMG SUMIP TESTING <br /> Test Method Developed By: 0 Sump Manufacturer ❑Industry Standard AfProfessional Engineer <br /> 0 Other(Specify) <br /> Test Method Used: 0 Pressure 0 Vacuum I&Hydrostatic <br /> 0 Other(Sped) <br /> Test Equipment Used: 4 l ett CrA Equipment Resolution: d/JZ <br /> Sump# .- Sump# Z Sump# Vump# <br /> Sump Diameter: G st 36, <br /> Sump Depth: <br /> Sump Material: Ft 6 <br /> Height from Tank Top to Top of <br /> Hi est Piping Penetration: <br /> Height from Tank Top to Lowest <br /> Electrical Penetration: <br /> Condition of sump prior to testing: <br /> Portion of Sump Tested' w Lf ► �� Ott <br /> Does turbine shut down when <br /> sump sensor detects liquid(both 0 Yes 0 No XIA 0 Yes ❑No OA 0 Yes N DNA 0 Yes 0 No 0 NA <br /> oduct and water)f <br /> Turbine shutdown response time <br /> Is system programmed for fail-safe 0 Yes 0 No kA 0 Yes 0 No NA 0 Yes 00 DNA 0 Yes DNA <br /> shutdown?* <br /> Was fail-safe verified to be 0 Yes 0 No IA ❑Yes 0 No ;dA 0 Yes 0 NA 0 Yeso DNA <br /> operationalf <br /> Wait time betwee ing <br /> pressure/vacuum/Water ajid starting <br /> test: /0 /41 gta4'e S ® Wt~4"'S <br /> Test Start Time: / , J ( : 3 J <br /> Initial Reading(111): ( .00 / V ® v l <br /> Test End Time: ,2; /-,r Z 0S <br /> Final Reading(RF): 00 ) ® U / <br /> Test Duration: rvl.N.�c�-G s 3 ~,I-e-5 <br /> Change in Reading(RF-Rj): N 0 v <br /> Pass/Fail Threshold or Criteria: Do p Ktw c D d '' iii` <br /> Test Result: ass 0 Fail Pass 0 Fail 10 Pass ❑Fall Pass 0 it <br /> Was sensor removed for testing? es 0 No 0 NA ja>fes 0 No ❑NA Yes 0 No ❑ Yes ❑No 0 A <br /> Was sensor properly replaced and >; s 0 No ❑NA $ 'e ❑No 0 NA Yes 0 No 0 N Yes 0 No 0 <br /> verified functional after testin ? <br /> Comments—(include 40m on repairs made prior to testing, and recommended ollow-u or ailed tests) <br /> j 6(sl S - . <br /> ' If the entire depth of the sump is not tested,specify how much was tested. If the answer to Ili of the questions indicated with an <br /> asterisk M is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />