Laserfiche WebLink
—� sa <br /> SWRCB,January 2002 Page of <br /> 9. SPUMOVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With S iWOverfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested <br /> Test Method Developed By: 0 Spill Bucket Manufacturer 0 Industry Standard Q Professional Engineer <br /> ❑Other(Spew) <br /> Test Metho ❑Pressure 0 Vacuum ❑Hydrostatic <br /> 0 Other(Spew) <br /> Test Equipment Used: Equipment Res on: <br /> Spill Box Spill Box# pill Box# Spill Box# <br /> B cket Diameter: <br /> Bucket Depth: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(RO: <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Readin -RI): <br /> Pass/Fail Thr old or <br /> criteria: ' <br /> Test Result.. 0 Pass ❑Fail ❑ Pass 0 Fail ❑ Pass 0 Fail ❑ Pass Q Fail <br /> Comm pts— i glude information on repairs made rior to testing, and recommended ollow-u or ailed tests <br /> ? .5 ' <br />