My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MICHAEL CANLIS
>
7000
>
2300 - Underground Storage Tank Program
>
PR0232437
>
COMPLIANCE INFO_2009-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2023 1:25:56 PM
Creation date
6/3/2020 9:57:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2018
RECORD_ID
PR0232437
PE
2361
FACILITY_ID
FA0003787
FACILITY_NAME
SHERIFFS OPERATIONS CTR #1
STREET_NUMBER
7000
Direction
N
STREET_NAME
MICHAEL CANLIS
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19305014
CURRENT_STATUS
01
SITE_LOCATION
7000 N MICHAEL CANLIS RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232437_7000 N MICHAEL CANLIS_2009-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
470
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-3- <br /> 2. The Clean Air Separator shall be installed within 100 feet from the vent line(s), <br /> and the associated piping shall be sloped 1/8" per foot minimum toward the vent <br /> line(s). <br /> Pressure/Vacuum Vent Valves for Gasoline Storaue Tank Vents <br /> 1. All PN vent valves shall be an ARB-certified PN vent valve for a Phase I system. <br /> 2. At least one pressuretvacuum (PN) vent valve shall be installed on each <br /> gasoline storage tank vent. The maximum number of PN vent valves allowed <br /> and P/V vent valve performance specifications are listed in the applicable Phase <br /> I EVIR Executive Order. Vent lines may be manifold to minimize the number of <br /> PN vent valves and potential leak sources, provided the manifold conforms to all <br /> applicable fire regulations. At least one PN vent valve shall be installed on vents <br /> if a manifold is incorporated. Figure 2B-3 or 2B-3H shows a typical manifold <br /> configuration for a single PN vent valve with the Clean it Separator. If two or <br /> more PN vent valves are desired, they shall be installed jin_pgrallel, so that each <br /> can serve as a backup to the other if one should fail to open properly Figure <br /> 213-4 or 2134H shows a typical manifold configuration for two PN vent valves <br /> installed in parallel with the Clean Air Separator. Figure 213-6 or 2B-6H shows <br /> a typical manifold configuration for three PJV vent valves installed in parallel with <br /> the Clean Air Separator. Figure 213-6 or 2B-6H shows a typicalconfiguration for <br /> a PN vent valve mounted on a single 3" vent line with the Clean it Separator. <br /> Figures 213-3, 2B-4, 213-5 and 213-6 apply to vertical CAS installations. Figures <br /> 2B-3H, 2134H, 213-51-1 and 213-61-1 apply to horizontal CAS installations. <br /> VaDor Recovery PIRIng ConflgMMULons <br /> NQTE: or Retum Piping shall nteet the reguilrernents sR2c!fmd in <br /> section 4.11 of CIR-2011. <br /> 1 Vapor Return and Vent Lines <br /> a. For facilities installed on or after April 1, 2003, all vapor return and vent <br /> lines shall be a minimum nominal internal diameter of 2 inches from the <br /> dispensers or the vent stacks to the first manifold. All lines after the first <br /> manifold and back to the underground storage tank shall have a minimum <br /> nominal internal diameter of 3 inches. <br /> Note: Facilities permitted by a local district prior to April 1, 2003 shall <br /> be required to meet the three inch diameter standard only on <br /> facility modification requiring exposing at least 50 percent of the <br /> underground vapor return piping. <br /> Healy Systems, Inc. Phase 11 EVIR System, Exhibit 2-VR-201-H <br />
The URL can be used to link to this page
Your browser does not support the video tag.