My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MICHAEL CANLIS
>
7000
>
2300 - Underground Storage Tank Program
>
PR0232437
>
COMPLIANCE INFO_2009-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2023 1:25:56 PM
Creation date
6/3/2020 9:57:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2018
RECORD_ID
PR0232437
PE
2361
FACILITY_ID
FA0003787
FACILITY_NAME
SHERIFFS OPERATIONS CTR #1
STREET_NUMBER
7000
Direction
N
STREET_NAME
MICHAEL CANLIS
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19305014
CURRENT_STATUS
01
SITE_LOCATION
7000 N MICHAEL CANLIS RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232437_7000 N MICHAEL CANLIS_2009-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
470
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-4- <br /> Afterbackfilling the vapor return and vent lines, the maximum pressure <br /> drop shall not exceed 0.5 inches WC at 60 cubic feet per our as <br /> determined by TP-201.4, Dynamic Backpiressure. The pressure drop shall <br /> be measured from the dispenser riser tote UST with pressure/vacuum <br /> vent valves installed and with the poppeted Phase I vapor connection <br /> open. <br /> b. For existing installations, the maximum pressure drop through the system <br /> shall not exceed 0.5 inches WC at 60 cubic feet per our as determined by <br /> TP-201.4, Dynamic Backpinessure. The pressure drop shall be measured <br /> from the dispenser riser tot UST with the pressure/vacuum vent valves <br /> installed and with the poppeted Phase I vapor connection open. <br /> Note: The V/L test from Exhibit 5 may be used to verify proper operation of the <br /> system, in lieu of measuring the pressure drDp through the lines, provided <br /> that at least two gallons of product are introduced into the system through <br /> each dispenser riser, for to the test. <br /> 2. All vapor return lines shall have a minimum slope of 1/8 in per foot from the <br /> dispenser riser tothe riser of the T. A slope of 1/4 inch or more per foot is <br /> recommended wherever feasible. The vapor return path from any dispenser riser <br /> to the underground storage tank shall be free of liquid or fixed blockage. <br /> 3. The dispenser shall be connected tot riser with either flexible or rigid material <br /> that is listed for use with gasoline. The dispenser-to-riser connection shall be <br /> installed so that any liquid in the lines will drain toward the gasoline storage tank. <br /> The internal diameter oft connector, including all fittings, shall not be less than <br /> one-half inch (1/2"). <br /> Note: The dispenser-to-riser connection is defined as the piping connection <br /> between the outlet oft vacuum pump and the inlet of the dispenser <br /> riser. A vapor shear valve may also be part of the riser connection. <br /> 4. There is no length restriction fort vapor return piping of the system as long as <br /> the system complies with the maximum pressure drop requirement of Item 1 (or <br /> the V/L option). <br /> 5. No product shall be dispensed from any fueling of at a GDF installed with the <br /> Healy Phase 11 EVIR System if there is a vapor line that is disconnected and open <br /> to the atmosphere. <br /> 6. No liquid condensate traps are allowed with this system. <br /> Healy Systems, Inc. Phase 11 EV IR System, Exhibit 2-VR-201-H <br />
The URL can be used to link to this page
Your browser does not support the video tag.