Laserfiche WebLink
ARB Approved IOM—Healy Ite If EVIR System—VR-201-A(7513 Series Page 24 <br /> 1.2 Healy Model No. 75B Series Coa)dal Hose Breakaway <br /> kzALY_wAmnvmmmwovwy E:tQ onpwmmEm <br /> PAKr NO IrMw nnNEM"'WAl"=� <br /> A98OWYaMTAUATM <br /> go The Healy Brackaway Is ddhwed loosely assembled.Handis <br /> carefully to avoid dropping and/or losing the precision ports. ionwkrZos 4 <br /> a Fallure to remove th®Show screw(item 1)as described In shown <br /> Step 1 below could result In fracturing or showing of the screw <br /> The Shear screw will require replacement if damaged. <br /> ill Be sure to assernWe parts in the exact sequence an shown bakm. <br /> • Be sure to lubricate all a-ringe cad quad spols where Indicated. <br /> Use of ordinary to on to sufficlent PIGTAIL <br /> • Do not use thl"006-seding eamimmda an straight threads. <br /> ASSEMBLY RMTRUCnoma 4 <br /> (refer to diagram at right) <br /> I.Rernove the Shear Screw(item 1)and the poddnq materials. TM <br /> Separate the holves of the breakaway assm"y,retaining the <br /> loom internal valves.(items 2&3)and the Wring(Iteni 13) <br /> Inside the upper half. 5 <br /> 2.Select the pigton. (whip hose)assembly.Lubrbxrte the quad 111=1!nd 13 <br /> and o--rin=(items 4�5.8,&strapht thread.Item 6). ltfff2 <br /> Assemble a pigtail to the Input half 4 the Breakaway(We <br /> rn 7) EV <br /> being swore14 that the larger and of the canical Wring is centered Quad r <br /> in the groan on the while valve. hose to Breakaway at 0109 <br /> 35 foot pounds,Be sure the vWcr=fftthg$lidet;sually bw as 2 <br /> Itern 2 before Mial tightening. <br /> 3.Sed <br /> (item elect the delivery hose.hdwhxft the ag(ftern 4),the quad 7 <br /> 5)and straight thread Item 6).Assemble the eW with <br /> the quad sed to the output half S the Bredumay Otern 10). BREAKAWAY <br /> install the secondary how wW tighten to 35 foot pounds.Be sure <br /> 12 <br /> the vapor tube fitting slides easily into item 3 before find tightening. ALIGNMENT <br /> 4.Carefully fit both holves of the Breckaway together.Utb*kg PIN <br /> the alignment pin,fully compress both holves and Intoort the <br /> Shear Screw(Item 1)and hand tkjhtem Final tighten to 20 <br /> inch pounds.Toole shoutild,not ben to InitlWy start SPARE <br /> the screws. 10 <br /> 91 <br /> 14 2 1 t-w 8-214%FROMEMI 457" 3 <br /> 13 1 00110MAL <br /> 12 1 1-= 14 <br /> 2 79-3m -04papommmmm 5 <br /> --!_BMZMU SM NOME EM <br /> I__IZZ2 MR 6 <br /> I . M 740 shown <br /> a 2 <br /> 5 4 AIM OMD-MSM 111� 4 <br /> 4 it-ago O-IMRFRE�apa 1112 H( <br /> RZAR-M M <br /> IBM-" 'M- <br /> z lgam-m atzman no <br /> NR an I on onorm <br /> PROD=-'W NOZZLI&EM <br /> Healy Systems, Inc. Website: hftp://WWW.healysystems.com <br /> 18 Hampshire Drive Email:sates@healysyr-tems.com <br /> Hudson, New Hampshire 03051 USA Telephone'.603.882.2472 <br /> ARB Approved Installation,Operation and Maintenance Manual(April 8,2005) Fax.603.882.5189 <br /> ii <br /> Healy Systems Inc -the innovative leader of Stage 11 vapor recovery equipment <br />