My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MICHAEL CANLIS
>
7000
>
2300 - Underground Storage Tank Program
>
PR0232437
>
COMPLIANCE INFO_2009-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2023 1:25:56 PM
Creation date
6/3/2020 9:57:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2018
RECORD_ID
PR0232437
PE
2361
FACILITY_ID
FA0003787
FACILITY_NAME
SHERIFFS OPERATIONS CTR #1
STREET_NUMBER
7000
Direction
N
STREET_NAME
MICHAEL CANLIS
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19305014
CURRENT_STATUS
01
SITE_LOCATION
7000 N MICHAEL CANLIS RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232437_7000 N MICHAEL CANLIS_2009-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
470
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
System— -201t Breaks — 7001 Page 27 <br /> ARB Approved tale Healy Ph kl E ys (Breakaway <br /> Healy Model 8701VV Breakaway 6 � <br /> o <br /> HMY STAM 11 Y <br /> PART Y PVW WWAIQ _ <br /> n3 <br /> ® The Hedy Brackaway Is delivered i -y Handle 11 as �--�^Q <br /> carefully to avoid dropping and/or losing the ion parts. <br /> shown <br /> ■ Failure to remove the Shear screw(Item 1)as described in <br /> Step 1 mow could result In fracturing or shearing of the screw <br /> The Shear require replacement If damaged <br /> IS Be sure to assemble parts In the exact sequence as shown below. <br /> ■ Be sure to lubricate all&-ringe and quad ends where Indicated. <br /> Use of ordinary motor all is suflident. PIGTAIL <br /> IS Do not use thread-ding eompowds on straight <br /> ASSOMY INSTRUCTIONS <br /> 4 <br /> (refer to diagram at right) <br /> STRAIGHT <br /> 1.Remove the Shear Screw(item 1)and the podding materials. THREAD <br /> Sesparate flee halves of the breakaway assembly,retaining the e <br /> iaoea the mat valves.(Items 2&3)and the spring(item 13) <br /> inside the u half. $ <br /> 2 Sated the pigtA9,(whip how)amwrnblthe quadt3 <br /> and o—rhnseals s 4,5;8.&straight tie 8). <br /> Amble the pigtdl to the input half of the Bredanvay(Itern 7) 14 <br /> being aura that the larger end of the conical spring is centered Quad rings <br /> In the on the white valve.Tyhte n h to at Install as 2 <br /> 35 foo pounds,Be were the v tubo fftling elkles owly into shown <br /> Item 2 before final telh1% <br /> 3 the dWivory hose.lubricate the o-ring(item 4),the quad 7 <br /> seal(Item 5)and straight thread(Itam 6).Assemble the and with <br /> the quad to the output half o the Brackaway(item to). BREAKAWAY <br /> install the secondary how and tighten to 35 That pounds.Be wur@ 12 <br /> the vapor tube fitting Wide; y into item 3 before find GjhtenbvW AUGNMENT <br /> PIN <br /> 4.carefully fit both halves of the Brealtaway together.Utlizing <br /> the meetn,frilly the t <br /> Show { t}and hard t1ghten,Final tighten to 20 SPARE <br /> Inde pounda.Teals shindd not be necessary to kdMY 6W 10 <br /> the <br /> tt <br /> 14 2 t-m _W _ 3 <br /> ue ' n� 14 <br /> 4t 1 1-affi "Mrasixess Over 1011 <br /> 2 a-N 8727 5 <br /> 1e t sea quad rings <br /> 2 1-e18 II as $ <br /> 7 1 Zra were o9 7� shown <br /> a z e <br /> 4 <br /> 4 40M sMeJ <br /> Pg ee4 <br /> 4 4 HOSE <br /> 3 -721 VIM Ea9 70 _ <br /> 2 1 -0me M <br /> 1 8 718 WEAL aA 7ffi <br /> Asioa, arc ern ew ceoxwmuP <br /> Lor CF MAMMAL <br /> =fO <br /> Healy Systems, Inc. Website: hftp:/Iwww.healysystems.com <br /> 18 Hampshire Drive Email:sales@healysystems.com <br /> Hudson, New Hampshire 03051 USA Telephone.603.882.2472 <br /> ARB Approved Installation, Operation and Maintenance Manual(April 8, ) Fax:603.882.5189 <br /> U�_Aa <br /> Healy Systems, Inc. —the innovative leader in Stage 11 vapor recovery equipment <br />
The URL can be used to link to this page
Your browser does not support the video tag.