My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2013
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
7373
>
2300 - Underground Storage Tank Program
>
PR0232494
>
COMPLIANCE INFO_2009-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2023 12:52:58 PM
Creation date
6/3/2020 9:57:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2013
RECORD_ID
PR0232494
PE
2361
FACILITY_ID
FA0002602
FACILITY_NAME
KAISER PERMANENTE
STREET_NUMBER
7373
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09416023
CURRENT_STATUS
01
SITE_LOCATION
7373 WEST LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232494_7373 WEST_2009-2013.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
429
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Feb 06 13 01.40p Elite IV Contactors 12094616342 p.3 <br />0 <br />H .w • <br />} R wr <br />, <br />Installation InsO:r <br />For repairing TCI FS or'i <br />VP <br />11M"Existing Direct Burial on Rigid or Flex:)! <br />This Kit applies to Traditional Repair products for Perp ?r <br />Fiberglass or Flex <br />g pipe installed "directly in the ground'. <br />WARNING: Prepare all surfaces to be bonded prior to coon, <br />Repair Kit for: , Failure to follow each step will void warranty & may result <br />URBKZ TCI SW FB 3950 -XX ..$ Before ordering the parts for this repair, determinE i- <br />pa9e 1 part and if you are in a "Flat" or "Curved" sump. See "`re <br />For Curved Sumo Repairs: Order the curved sump Borlji <br />Rev 3 - 4-23-2009 <br />General Instructions for: CLEANING: Spray all surfaces to be bonded with DBC Cleaner and allow t <br />cloth. Surfaces must be dry before applying bonder. <br />General Instructions for: BONDING TO POLY SUMPS OR <br />FIBERGLASS SUMPS: Clean, sand and rc u <br />apply RBB V between Bonding Ring & sump wall. <br />STEP 1: Loosen & Clean TO Nut <br />STEP 2: Verify Seal to Pipe <br />• Clean off any 'paste' or other bonders from around old TO <br />Inspect the boot <br />body & sump wall, <br />Patch & seal any possible leak paths <br />• Leave the clamp in place <br />between the pipe & the remaining <br />• Remove the plastic nut off the fitting <br />boot <br />• Clean & sand sump wall <br />Cut off the old plastic nut & discard <br />• Spray TCI Body & sanded sump wall with DBC cleaner <br />STEP 4: Install Bonding Ring, Nut, & Cuff Reducer <br />Wrack Bonding Ring over the existing pipe <br />Wrack Repair Nut over the existing pipe <br />Wrack Cuff Reducer over the existing pipe <br />STEP 5: Bond repair parts & Clamp <br />• Bond "Bonding Ring" with DBB III & clamp <br />Bond "Repair Nut" with DBB III & clamp <br />• Bond "Cuff Reducer" with DBB III & clamp <br />Seal around here <br />STEP 6: Install The Bonding Ring & Nut <br />• Apply DBB V to the sump side of the Br n4 <br />• Slide the Bonding Ring up to the Sump .Aa <br />• Apply DBB V to the sump side of the Nt t <br />• Thread Nut onto old TO body & tighte } <br />Apply DBB V to Sump side of <br />Bonding Ring <br />Apply DBB V to Sump <br />Replacement Nut <br />Bondin <br />am <br />i <br />4 P `y• <br />lotions <br />13 3950's with <br />ging applications" Repair Kit <br />I culjr piping entries on Existing <br />'acting installation steps below, <br />n premature failure of penetration fitting. <br />jou have a "Fine" or "Course" thread <br />l: Tips" if unsure which part(s) you have. <br />i; Rine In addition to this kit <br />•air dry or wipe excess with a clean dry <br />up sump surfaces. Clean fitting and <br />STEP 3: Clean all Repair Components <br />Clean all repair components with DBC <br />prior to installation <br />Split TO Cleaner <br />Nut <br />�w bo -3C' <br />`?7 <br />Split <br />Cuff Reducer Split Bonding Ring <br />n <br />rig Ring <br />I <br />to Bonding Ring <br />erment Nut threaded in place <br />Diversified Products Manufacturing Inc. 5523 Baggett Marysville Road, Oroville, CA 9! 9 530-534-3966 www.dpm-llc.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.