Laserfiche WebLink
JUL 2 5 2016 <br /> D. Results of Testing/Servicing <br /> Software Version Installed: 133.06 J ' - w <br /> Complete the following checklist: <br /> QYes No* is the audible alarm operational? <br /> DYes No* is the visual alarm operational? <br /> dyes Ll No' Were all sensors visually inspected,functional) tested,and confirmed operational? <br /> [dyes ❑No' Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their <br /> proper eration? <br /> es No' If alarms are relayed to a remote monitoring station,is all communications equipment(e.g.modem)operational? <br /> YJ WA <br /> Elyes 8 No' For pressurized piping systems, does the turbine automatically shut down •rf the piping secondary containment monitoring system <br /> d N/A erects a leak,fails to operat _-or•.s electrically disconnected? If yes:which sensors initiate positive shut-down? (Check all that apply) <br /> L.tiump/Trench Sensors., spenser Containment Sensors. Did you confirm positive shut-down due to leaks and sensor <br /> failureldisconnection? es o. <br /> wl'es e No` For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e.no mechanical overfill prevention <br /> N/A valve is installed),is the overfill warning alarm visible and audible at the tank fill point(s)and operating properly? If so,at what percent <br /> of tank capacity does the alarm trigger? 90 % <br /> es' d No Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced and list the <br /> manufacturer name and model for all replacement parts in Section E,below. <br /> es' e1 No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply)[--Product; LWater. If <br /> es describe causes in Section E,below. <br /> _-Wes LJ No* Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> d es I Lj No' Is all monitoring equipment operational per manufacturers specifications? <br /> *in Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br /> Monitor Panel Battery Check:3.69 Volts. <br /> Monitor Panel Battery Replaced:[ ]Yes (X]No <br /> Monitoring System Certification Page 2 of 4 12107 <br />