My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2014-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
7373
>
2300 - Underground Storage Tank Program
>
PR0232494
>
COMPLIANCE INFO_2014-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2023 1:27:31 PM
Creation date
6/3/2020 9:57:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2014-2018
RECORD_ID
PR0232494
PE
2361
FACILITY_ID
FA0002602
FACILITY_NAME
KAISER PERMANENTE
STREET_NUMBER
7373
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09416023
CURRENT_STATUS
01
SITE_LOCATION
7373 WEST LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232494_7373 WEST_2014-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
324
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. In-Tank Gauging/SIR Equipment: ❑ Check this box If tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipments istaHed. -- <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: JL 2 2016 <br /> Yes No* Has all input wiring been Inspected for proper entry and termination,including testing for ground faults? <br /> �/ Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? Or <br /> Yes ❑ No* Was accuracy of system product level readings tested? <br /> Yes ❑ No* Was accuracy of system water level readings tested? <br /> Yes ❑ No* Were all probes reinstalled properly? <br /> Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors(LLD : V1 Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> ❑ Yes No* For equipment start-up or annu"quipmentcertification, a leak simulated to verify LLD performance?(Check all <br /> N/A that apply) Simulated leak rate: 3 g.p.h.;U 0.1 g.p.h; J 0.2 g.p.h. <br /> Yes No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> Yes No" Was the testing apparatus properly calibrated? <br /> Yes No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> N/A <br /> Yes Ne For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> N/A <br /> ❑ Yes No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is dsabled or <br /> N/A disconnected? <br /> ❑ Yes No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or <br /> NIA fails a test? <br /> ❑ Yes No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> N/A <br /> Yes E7 No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *in the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Annunciator bulb burned out, replaced and tested. <br /> Monitoring System certification Page 3 of 4 12107 <br />
The URL can be used to link to this page
Your browser does not support the video tag.