My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1991-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
633
>
2300 - Underground Storage Tank Program
>
PR0232519
>
COMPLIANCE INFO_1991-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2024 11:37:26 AM
Creation date
6/3/2020 9:57:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1991-2008
RECORD_ID
PR0232519
PE
2361
FACILITY_ID
FA0000483
FACILITY_NAME
BILLS 76
STREET_NUMBER
633
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04321055
CURRENT_STATUS
01
SITE_LOCATION
633 E VICTOR RD STE A
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232519_633 E VICTOR_1991-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
551
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />U <br />c Q1WrnNnAVV PIPF. TFCTiNV. <br />Page 3 of 8 <br />Test Method Developed By: <br />U Piping Manufacturer X Industry Standard U Professional Engineer <br />U Other (Specify) <br />Test Method Used: <br />XJ Pressure <br />U Other (Specify) <br />U Vacuum <br />U Hydrostatic <br />Test Equipment Used: <br />Piping Material: <br />Pressure gages <br />Piping Run # 1 <br />Fiberglass <br />Piping Run # 2 <br />Fiberglass <br />Equipment Resolution: <br />Piping Run # 3 Piping Run # <br />Fiberglass <br />Piping Manufacturer: <br />Ameron <br />Ameron <br />Ameron <br />Piping Diameter: <br />,e <br />ee <br />ee <br />Length of Piping Run: <br />100, <br />e <br />o <br />Product Stored: <br />Re + <br />Method and location of <br />piping -run isolation: <br />rom inside d' sp pan <br />o inside DiDE SUMP SAME <br />Same <br />Wait time between applying <br />pressure/vacuum/water and <br />startingtest: <br />1 hr . <br />hr. <br />z hr. <br />Test Start Time: <br />1 1:30 <br />1 1:30 <br />11:30 <br />Initial Reading (R,): <br />4.5 PSI <br />4.5 PSI <br />4.5 P S I <br />Test End Time: <br />12:30 <br />12.30 <br />1 2 <br />Final Reading (RF): <br />4.5 PSI <br />4.5 PSI <br />4.5 P S I <br />Test Duration: <br />1 hr. <br />1 hr, <br />Change in Reading (RF -R,): <br />Pass/Fail Threshold or <br />Criteria: <br />0 Loss <br />0 Loss <br />0 Loss <br />Test Result: <br />LX Pass U Fail <br />V Pass U Fail <br />LX Pass U Fall U Pass U Fall <br />Comments — (include information on repairstnade priors !!siting and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.