Laserfiche WebLink
SWRCB, January 2002 IVIA <br />C CF.VnNIlARV PIPF. TRVNTING <br />Page 4 of 8 <br />Test Method Developed By: <br />U Piping Manufacturer U Industry Standard U Professional Engineer <br />U Other (Spec) <br />Test Method Used: <br />U Pressure U Vacuum U Hydrostatic <br />U Other (Specify) <br />Test Equipment Used: <br />Piping Material: <br />Equipment Resolution: <br />Piping Run # Piping Run # Piping Run # Piping Run # <br />Piping Manufacturer: <br />Piping Diameter: <br />Length of Piping Run: <br />Product Stored: <br />+ <br />Method and location of <br />piping -run isolation: <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />Test Start Time: <br />Initial Reading (111): <br />Test End Time: <br />Final Reading (RF): <br />Test Duration: <br />Change in Reading (RF-Rj): <br />Pass/Fail Threshold or <br />Criteria: <br />Test Result: <br />U Pass U Fail U Pass U Fail U Pass U Fail U Pass U Fail <br />Comments — (include information on repairsmade priors te§ting and recommended follow-up forfailed tests) <br />