My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1991-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
633
>
2300 - Underground Storage Tank Program
>
PR0232519
>
COMPLIANCE INFO_1991-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2024 11:37:26 AM
Creation date
6/3/2020 9:57:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1991-2008
RECORD_ID
PR0232519
PE
2361
FACILITY_ID
FA0000483
FACILITY_NAME
BILLS 76
STREET_NUMBER
633
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04321055
CURRENT_STATUS
01
SITE_LOCATION
633 E VICTOR RD STE A
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232519_633 E VICTOR_1991-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
551
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 Page 6 of 8 <br />7_ UNDER -DISPENSER CONTAINMENT (UDC) TESTING <br />Test Method Developed By: <br />U UDC Manufacturer <br />IXMndustry Standard U Professional Engineer <br />U Other (Specify) <br />Test Method Used: <br />U Pressure <br />U Vacuum <br />LYHydrostatic <br />U Other (Spec) <br />Test Equipment Used: CaldwellEquipment <br />Resolution: <br />UDC# 1&2 <br />UDC# 3&4 <br />UDC# 5&6 <br />UDC# 7&8 <br />UDC Manufacturer: <br />? <br />? <br />? <br />? <br />UDC Material: <br />Plastic <br />Plastic <br />Plastic <br />Plastic <br />UDC Depth: <br />n <br />n <br />n <br />ee <br />Height from UDC Bottom to Top <br />of Highest Piping Penetration: <br />Bottom <br />Bottom <br />Bottom <br />Bottom <br />Height from UDC Bottom to <br />, <br />Lowest Electrical Penetration: <br />Bottom <br />Bottom <br />Bottom <br />BQ tam <br />Condition of UDC prior to <br />testing: <br />Dirty/Dry <br />Dirty/Dry <br />Dirty/Dry <br />Dirty/Dry <br />Portion of UDC Tested <br />Does turbine shut down when <br />U Yes U No XJ NA <br />UDC sensor detects either <br />U Yes U No IXNA <br />Utes U No LINA <br />U Yes U No LXNA <br />product or waterf <br />Turbine shutdown response time <br />A <br />N/A <br />Is system programmed for fail- <br />U Yes U No XJ NA <br />U yes UNo INNA <br />U Yes ' U No XLI NA <br />U Yes U No LXNA <br />safe shutdown?* <br />Was fail-safe verified to be <br />U Yes U No YU NA <br />UYes Woo INNA <br />U Yes U No XU NA <br />U Yes U No LANA <br />o rational?' <br />Wait time between applying <br />pressure/vacuum/water and <br />hr. <br />1 hr. <br />z hr. <br />2 hr. <br />startingtest <br />z . <br />2 <br />Test Start Time: <br />12:15 <br />12:20 <br />1:20 <br />1 1:40 <br />Initial Reading (R,): <br />0 <br />0 <br />0 <br />0 <br />Test End Time: <br />1 <br />:50 <br />2:50 <br />12:10 <br />Final Reading RF): <br />0 <br />0 <br />0 <br />0 <br />Test Duration: <br />1 <br />Chan&e in Readin(E,,-R, : <br />Pass/Fail Threshold orCriterla: <br />Test Result: <br />X) Pass U Fall <br />N Pass U Fall <br />IX Pass U Fall <br />DI Pass U FaU <br />Was sensor removed for testing? <br />U Yl s 0 No L IVA <br />U Yes U No D(NA <br />U Yes U No LXNA <br />U Yes U No IXNA <br />Was sensor properly replaced and <br />Q Yes []No MqA <br />I U Yes U No IXNA <br />U Yes U No W4A <br />U Yes U No IRNA <br />verified functional after testing? <br />Comments — (include information on repairs made prior to testing, and recommended follow-up forfailed tests) <br />' If the testing method does not test the entire depth of the UDC, specify how much of the UDC was tested. Methods not testing the <br />entire UDC should only be used if the monitoring system provides fail-safe turbine shutdown. (See SWRCB LG -160) <br />Z With the submersible pump running, place the sensor in product (discriminating sensors should also be placed in water). The time <br />between placing the sensor in product and the turbine shutting down is the response time. This should be done if the secondary <br />containment testing method used does not test the entire volume of the UDC <br />This information is not needed if the entire UDC is tested. <br />
The URL can be used to link to this page
Your browser does not support the video tag.