My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1991-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
633
>
2300 - Underground Storage Tank Program
>
PR0232519
>
COMPLIANCE INFO_1991-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2024 11:37:26 AM
Creation date
6/3/2020 9:57:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1991-2008
RECORD_ID
PR0232519
PE
2361
FACILITY_ID
FA0000483
FACILITY_NAME
BILLS 76
STREET_NUMBER
633
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04321055
CURRENT_STATUS
01
SITE_LOCATION
633 E VICTOR RD STE A
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232519_633 E VICTOR_1991-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
551
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />6_ PIPING SITMP TESTING <br />Page 5 of 8 <br />Test Method Developed By: <br />U Sump Manufacturer <br />N Industry Standard U Professional Engineer <br />U Other (Specie) <br />Test Method Used: <br />❑ Pressure <br />❑ Vacuum <br />X] Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: <br />11 <br />Equipment Resolution: <br />Sump # 1 SUP <br />Sump # 2 Mid <br />Stimp # 3 ReSI <br />Sump # <br />Sump Diameter: <br />3611 <br />3611 <br />3611 <br />Sump Depth: <br />3 611 <br />3611 <br />3 6 `° <br />Sump Material: <br />Fiberglass <br />Fibercflass <br />Fiber lass <br />Height from Tank Top to Top of <br />Highest Piping Penetration: <br />22" <br />2211 <br />22°' <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />1 011 <br />12" <br />811 <br />Condition of sump prior to testing: <br />Dirty/Dry <br />Din ,/Dr <br />Dirty/Dry <br />Portion of Sump Tested' <br />24" <br />241t <br />24" <br />Does turbine shut down when <br />U Yes N No U NA <br />sump sensor detects either product <br />U Yes IXNo U NA <br />U Yes X No U NA <br />U Yes U No U NA <br />or water'?* <br />Turbine shutdown response timet` <br />N/A <br />Is system programmed for fail-safe <br />shutdown?' <br />U Yes U No ill NA <br />U Yes U No XJ NA <br />U Yes U No NNA <br />U Yes U No U NA <br />Was fail-safe verified to be <br />U Yes U No N NA <br />(I Y8s UNo YU NA <br />U Yes U No SNA <br />U Yes U No U NA <br />orationalf <br />Wait time between applying <br />pressure/vacuum/water and starting <br />hr. <br />hr. <br />hr <br />test: <br />.a <br />. <br />Test Start Time: <br />1 :45 <br />1:05 <br />12.10 <br />Initial Reading (R,): <br />Test End Time: <br />Final Reading (RF): <br />0 <br />0 <br />0 <br />Test Duration: <br />1r <br />i <br />? h <br />Change in Reading (I? -R,):0 <br />0 <br />0 <br />Pass/Fail Threshold or Criteria: <br />0 Loggs <br />0 Loss <br />0 Loss <br />Test Result: <br />R Pass U Fall <br />LX Pass U Fall <br />Xl Pass U Fall <br />U Pass U Fall <br />Was sensor removed for testing? <br />LXYes U No U NA <br />KYes U No U NA <br />SCJ Yes U No U NA <br />U Yes U No U NA <br />Was sensor properly replaced and <br />LXYes U No U NA <br />LYes U No U NA <br />X]Yes U No U NA <br />U Yes U No U NA <br />verified functional after testin ? <br />Comments — (include information on repairs made prior to testing, and recommended follow-up forfailed tests) <br />' If the testing method does not test the entire depth of the sump, specify how much of the sump was tested. Methods not testing the <br />entire sump should only be used if the monitoring system provides fail-safe turbine shutdown. (See SWRCB LG -160) <br />2 With the submersible pump running, place the sensor in product (discriminating sensors should also be placed in water). The time <br />between placing the sensor in product and the turbine shutting down is the response time. This should be done if the secondary <br />containment testing method used does not test the entire volume of the sump. <br />This information is not needed if the entire sump is tested. <br />
The URL can be used to link to this page
Your browser does not support the video tag.