Laserfiche WebLink
OIL EQUIPMENT SERVICE <br />Division of Keith A. Tallia, Inc. <br />HEALTH and SAFETY PLAN <br />C <br />STATE LICENSE No. 329417 <br />CLASSIFICATION: A-HAZ., C61D40 <br />STATE ENVIRONMENTAL ASSESSOR No.: 01781 <br />Telephone: (209) 754-1808 <br />Post Ottice Box 950 <br />750 Industrial Way <br />SAN ANDREAS, CALIFORNIA 95249 <br />The site location for the proposed job of removing one underground <br />motor fuel tank and related piping; and also doing exploratory <br />excavation and soil sampling at another spot at this site where <br />another tank had previously been removed by others is as follows:* <br />Knb�<'s Texaco Food Mart <br />633 E. Victor Road <br />Lodi, CA 95240 <br />One each 2500 oallon gasoline tank <br />The project manager, and the health and safety coordinator is <br />Keith A. Tallia of Oil Equipment Service. The site safety officers <br />at the job site will be Keith A. Tallia of Oil Equipment Service. <br />The alternate site safety officer will be Robert M. Dragomanovich <br />of Oil Equipment Service. <br />Oil Equipment Service will have on the site (2) fire extinguishers <br />and one (1) first-aid kit within 50' of the tank location. See <br />attached map. No smoking will be permitted within 50' of the tank <br />or areas where flammable vapors are present. <br />Oil Equipment Service shall notify the local Fire Department 48 <br />hours before excavation shall begin. USA will also be notified <br />before excavation of job. <br />Tanks must be empty of product before start of job. Oil Equipment <br />Service will triple rinse tank with water. Rinse will be hauled <br />away by Nor Cal Oil Co. waste hazardous hauler. Tank will be dry <br />iced, 15 pounds of dry ice per 1,000 gallons, before excavating. <br />Oil Equipment Service shall monitor tank with a Combustible Gas <br />Indicator (CGI) and seal all openings before tank will be transported. <br />At no time will anyone cut or weld the tank. Tank will be secured <br />on truck after extraction for transportation. Tank and plumbing <br />will be hauled by Oil Equipment Service to Triangle Inc. of Sac- <br />ramento to be properly disposed of via destruction. <br />Oil Equipment Service will approach all tank extractions with possible <br />cave-ins. The following rules will be followed to prevent any <br />mishaps: 1) soil to be inspected for stability before and after <br />tank is removed, 2) soil is to be kept at least two (2) feet from <br />the edge of an excavation, 3) if excavation is five (5) feet or <br />more the hole shall be tapered, braced, or other equivalent methods <br />shall be used to prevent possible cave-ins. Precautions will be <br />taken at all -times. <br />