My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1991-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
633
>
2300 - Underground Storage Tank Program
>
PR0232519
>
COMPLIANCE INFO_1991-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2024 11:37:26 AM
Creation date
6/3/2020 9:57:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1991-2008
RECORD_ID
PR0232519
PE
2361
FACILITY_ID
FA0000483
FACILITY_NAME
BILLS 76
STREET_NUMBER
633
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04321055
CURRENT_STATUS
01
SITE_LOCATION
633 E VICTOR RD STE A
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232519_633 E VICTOR_1991-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
551
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
v' <br />HEALTH and SAFETY PLAN <br />Page 2 <br />At the job site, clean fill will be used to backfill the empty hole <br />after soil samples have been taken by Condor Earth Technologies Inc. <br />Soil samples will be excavated using backhoe. Samples will be taken <br />two (2) feet to four (4) feet by hand using brass tubes. All of <br />the above procedures will be done according to code. Any part not <br />backfilled shall be barricaded with construction barricades and <br />caution tape will be used. <br />Oil Equipment Service will use equipment for each tank removal. <br />No undersize or bad mechanical equipment will be used. All heavy <br />equipment will be supported properly. Tank is to be secured at <br />the assigned location after extraction. <br />Oil Equipment Service will provide safety hats, goggles, and <br />clothing to employees at the job site as per OSHA regulation <br />29 CFR 1910.120. Caution will be noted that a heat stress situation <br />may develop when impermeable protective clothing is worn. <br />Oil Equipment Service will hold shop meetings before start of tank <br />removals to discuss safety procedures. The "buddy system" will be <br />discussed and the course of action to be taken should an injury <br />occur to an employee. Some of the many rules to be discussed to <br />help prevent injury or accident are: 1) avoid standing on top of <br />tank - - surface maybe slippery or rusty, 2) check for falling <br />objects, slipping, and tripping hazards, 3) visqueen sheeting will <br />be used if necessary around excavated soil, 4) where necessary, <br />the site will be secured with construction barricades and warning <br />signs posted to prevent the exposure of unauthorized, unprotected <br />people to site hazards, 5) limit exposure time to noisy equipment, <br />6) keep a safe distance from the excavation and heavy equipment, <br />7) stay up -wind from the tank and/or excavation to avoid unnecessary <br />exposure whenever possible, 8) limit exposure by minimizing the <br />exposure time and maximizing the distance to the source of vapor <br />release, 9) avoid the area or take special caution when ventilating <br />the tank with water, dry ice or air, 10) do not enter the excavation <br />without first monitoring the air. <br />Oil Equipment Service shall provide San Joaquin Public Health <br />Service a map of the nearest hospital and route to be taken should <br />an injury occur. A copy of the map will also be on the job site. <br />
The URL can be used to link to this page
Your browser does not support the video tag.