Laserfiche WebLink
4. X Tank cross-sectional diagram included on blueprints. <br />5. ->- Detail of tank, piping system, excavation and cover. <br />6. Tank(s) and piping approved by a nationally recognized independent testing <br />organization. [Title 23, Subchapter 16, Article 3, Sec. 2631 (r) & 2635] <br />7. Verification of product compatibility with the tank(s), piping, monitoring <br />device(s), epoxy or silicone glues, etc. [Section 2635 -(b) (2)] <br />S. Manufacturer's written installation instructions for tank(s), piping, monitoring <br />devices, etc. [Section 2635 (b) (5)] <br />9. Tightness Test (NFPA 30) is required on both primary (1°) and secondary <br />(20) containment systems before covering. [Section 2635 (b) (6) & (7)J <br />10. Double walled tanks using pressure or vacuum testing to monitor the annular <br />space. [Section 2635 (b) (7)] <br />11. X NFPA 329 "Precision Test" required upon completion of installation with tank <br />in operating condition. Test results to be submitted directly to PHS/EHD <br />from the testing company or owner of facility. [Health BSc Safety Code, <br />Division 20, Chapter 6.7, Section 25291 (g)] <br />12. THINK COMPOSMON <br />TANK # <br /># / <br /># Z <br />I # 3 <br /># <br /># <br />CAPACITY <br />/2, <br />/z,c�o <br />/z/cam <br />MANUFACTURER <br />COMPOSITION <br />MODEL <br />burr Zp <br />-L>,rT- zP <br />I>iVT- z P <br />PRODUCT <br />CORROSION <br />PROTECTION <br />% <br />.( <br />U.T.. LISTED <br />COMPATIBILITY <br />WITH 100%®� <br />METHANOL <br />4 <br />